Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standards
Correct process modelling is crucial for the implementation of BIM technology. Considering the interest of public procurement, the use of open standards supports the transparency of spending public money on construction projects. The aim of this paper is to model the flow of information at the stage...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20184500061 |
id |
doaj-59bfa71f8f014e84a7d7f93e1fa72198 |
---|---|
record_format |
Article |
spelling |
doaj-59bfa71f8f014e84a7d7f93e1fa721982021-02-02T03:18:52ZengEDP SciencesE3S Web of Conferences2267-12422018-01-01450006110.1051/e3sconf/20184500061e3sconf_infraeko2018_00061Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standardsOwerko TomaszOwerko PiotrCorrect process modelling is crucial for the implementation of BIM technology. Considering the interest of public procurement, the use of open standards supports the transparency of spending public money on construction projects. The aim of this paper is to model the flow of information at the stage of bridge load testing in order to properly use BIM technology for bridges. The authors present a concept known from software engineering - design pattern – a general, reusable solution for a commonly occurring problem within a given context, this time applied in infrastructure design.https://doi.org/10.1051/e3sconf/20184500061 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Owerko Tomasz Owerko Piotr |
spellingShingle |
Owerko Tomasz Owerko Piotr Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standards E3S Web of Conferences |
author_facet |
Owerko Tomasz Owerko Piotr |
author_sort |
Owerko Tomasz |
title |
Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standards |
title_short |
Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standards |
title_full |
Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standards |
title_fullStr |
Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standards |
title_full_unstemmed |
Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standards |
title_sort |
methodology for linking business processes undertaken during bridge load testing with the specification of required information according to openbim standards |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2018-01-01 |
description |
Correct process modelling is crucial for the implementation of BIM technology. Considering the interest of public procurement, the use of open standards supports the transparency of spending public money on construction projects. The aim of this paper is to model the flow of information at the stage of bridge load testing in order to properly use BIM technology for bridges. The authors present a concept known from software engineering - design pattern – a general, reusable solution for a commonly occurring problem within a given context, this time applied in infrastructure design. |
url |
https://doi.org/10.1051/e3sconf/20184500061 |
work_keys_str_mv |
AT owerkotomasz methodologyforlinkingbusinessprocessesundertakenduringbridgeloadtestingwiththespecificationofrequiredinformationaccordingtoopenbimstandards AT owerkopiotr methodologyforlinkingbusinessprocessesundertakenduringbridgeloadtestingwiththespecificationofrequiredinformationaccordingtoopenbimstandards |
_version_ |
1724308149150679040 |