Research on Optimization Design and Application for 1 000 MW Power Plant Under Current Stricter EIA Standard
[Introduction] The initial investment and operation cost of the power plant are significantly increased after the ultra-low emission configuration is selected for the project of new coal-fired power units. The main purpose of this paper is to carry out detailed technical research on how to optimize...
Main Authors: | HUANG Haihua, WU Afeng |
---|---|
Format: | Article |
Language: | English |
Published: |
Energy Observer Magazine Co., Ltd.
2019-06-01
|
Series: | 南方能源建设 |
Subjects: | |
Online Access: | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2019.02.006 |
Similar Items
-
MW-PPG Sensor: An on-Chip Spectrometer Approach
by: Cheng-Chun Chang, et al.
Published: (2019-08-01) -
The Role of MW Plasma Treatment on the Corrosion Resistance of Stainless Steels
by: Kasprzyk D., et al.
Published: (2013-12-01) -
Feasibility Reascher on Ultra-supercritical 350 MW Unit and Analysis of Main Equipment Parameter
by: GAO Huiyun, et al.
Published: (2019-12-01) -
Studi Pemanfaatan Limbah Padat dari Perkebunan Kelapa Sawit pada PLTU 6 MW di Bangka Belitung
by: Harris Harris, et al.
Published: (2013-03-01) -
Dielectric Spectroscopy in Biomaterials: Agrophysics
by: Dalia El Khaled, et al.
Published: (2016-04-01)