Employing multi criteria optimisation methods for risk assessment of damage to bridge objects

The article presents the possible employment of multiple criteria optimisation methods in the process of evaluating the risk of damage to engineering facilities as a result of terrorist attacks. The subject of the analyses covered selected bridge facilities in the area of Wrocław. The article prese...

Full description

Bibliographic Details
Main Authors: Artur Duchaczek, Dariusz Skorupka
Format: Article
Language:English
Published: Lublin University of Technology 2013-03-01
Series:Budownictwo i Architektura
Subjects:
Online Access:https://ph.pollub.pl/index.php/bia/article/view/2161
id doaj-58f739d9132f46d5a51c1f3035de9a80
record_format Article
spelling doaj-58f739d9132f46d5a51c1f3035de9a802020-11-25T03:26:42ZengLublin University of TechnologyBudownictwo i Architektura1899-06652544-32752013-03-0112110.35784/bud-arch.2161Employing multi criteria optimisation methods for risk assessment of damage to bridge objectsArtur Duchaczek0Dariusz Skorupka1Department of System Engineering, Faculty of Management, General Tadeusz Kościuszko Military Academy of Land ForcesDepartment of Management, Faculty of Management, General Tadeusz Kościuszko Military Academy of Land Forces The article presents the possible employment of multiple criteria optimisation methods in the process of evaluating the risk of damage to engineering facilities as a result of terrorist attacks. The subject of the analyses covered selected bridge facilities in the area of Wrocław. The article presents the atypical application of two selected optimisation methods, i.e. the AHP method and the Bellinger’s method. The benefit of the analyses presented is a possible scientific justification for the adopted hierarchy of decision variants. https://ph.pollub.pl/index.php/bia/article/view/2161transport infrastructurecrisis managementrisk assessment
collection DOAJ
language English
format Article
sources DOAJ
author Artur Duchaczek
Dariusz Skorupka
spellingShingle Artur Duchaczek
Dariusz Skorupka
Employing multi criteria optimisation methods for risk assessment of damage to bridge objects
Budownictwo i Architektura
transport infrastructure
crisis management
risk assessment
author_facet Artur Duchaczek
Dariusz Skorupka
author_sort Artur Duchaczek
title Employing multi criteria optimisation methods for risk assessment of damage to bridge objects
title_short Employing multi criteria optimisation methods for risk assessment of damage to bridge objects
title_full Employing multi criteria optimisation methods for risk assessment of damage to bridge objects
title_fullStr Employing multi criteria optimisation methods for risk assessment of damage to bridge objects
title_full_unstemmed Employing multi criteria optimisation methods for risk assessment of damage to bridge objects
title_sort employing multi criteria optimisation methods for risk assessment of damage to bridge objects
publisher Lublin University of Technology
series Budownictwo i Architektura
issn 1899-0665
2544-3275
publishDate 2013-03-01
description The article presents the possible employment of multiple criteria optimisation methods in the process of evaluating the risk of damage to engineering facilities as a result of terrorist attacks. The subject of the analyses covered selected bridge facilities in the area of Wrocław. The article presents the atypical application of two selected optimisation methods, i.e. the AHP method and the Bellinger’s method. The benefit of the analyses presented is a possible scientific justification for the adopted hierarchy of decision variants.
topic transport infrastructure
crisis management
risk assessment
url https://ph.pollub.pl/index.php/bia/article/view/2161
work_keys_str_mv AT arturduchaczek employingmulticriteriaoptimisationmethodsforriskassessmentofdamagetobridgeobjects
AT dariuszskorupka employingmulticriteriaoptimisationmethodsforriskassessmentofdamagetobridgeobjects
_version_ 1724591210290479104