Inspection of pile foundation before constructing additional storeys оn existing buildings

The problem of constructing additional storeys on existing buildings is really up-to-date nowadays. Implementation of the above-mentioned process should be undertaken after the inspection of constructions. Foundation is the construction which takes additional loads. The inspection of construction...

Full description

Bibliographic Details
Main Authors: A.V. Ulybin, S.V. Zubkov, S.D. Fedotov, A.Yu. Zakrevsky
Format: Article
Language:English
Published: Peter the Great St. Petersburg Polytechnic University 2014-06-01
Series:Инженерно-строительный журнал
Subjects:
Online Access:http://engstroy.spb.ru/eng/index_2014_04/03.html
id doaj-56da50ec001f49aa91f2cc5bf5e110ce
record_format Article
spelling doaj-56da50ec001f49aa91f2cc5bf5e110ce2020-11-25T01:14:15ZengPeter the Great St. Petersburg Polytechnic UniversityИнженерно-строительный журнал2071-47262071-03052014-06-01484172710.5862/MCE.48.3Inspection of pile foundation before constructing additional storeys оn existing buildingsA.V. Ulybin0S.V. Zubkov1S.D. Fedotov2A.Yu. Zakrevsky3Saint-Petersburg State Polytechnical UniversitySaint-Petersburg State Polytechnical UniversitySaint-Petersburg State Polytechnical UniversitySaint-Petersburg State Polytechnical UniversityThe problem of constructing additional storeys on existing buildings is really up-to-date nowadays. Implementation of the above-mentioned process should be undertaken after the inspection of constructions. Foundation is the construction which takes additional loads. The inspection of constructions, which are located underground, i.e. piles, is a very complicated technical problem. This article considers the full inspection of the pile foundation, analysis of mistakes in the geological survey and ways of their elimination. The results of determining a bearing capacity of piles were described using three different methods: calculation, static penetration test, in-situ load tests were compared. The paper shows the essential difference between the results obtained by using different methods. The analysis of the survey’s results contributes to drawing up recommendations on the methodology of the pile foundation complex inspection.http://engstroy.spb.ru/eng/index_2014_04/03.htmlinspection of buildingsexcavation of test pitsbearing capacity of pilesconstruction of additional storeys
collection DOAJ
language English
format Article
sources DOAJ
author A.V. Ulybin
S.V. Zubkov
S.D. Fedotov
A.Yu. Zakrevsky
spellingShingle A.V. Ulybin
S.V. Zubkov
S.D. Fedotov
A.Yu. Zakrevsky
Inspection of pile foundation before constructing additional storeys оn existing buildings
Инженерно-строительный журнал
inspection of buildings
excavation of test pits
bearing capacity of piles
construction of additional storeys
author_facet A.V. Ulybin
S.V. Zubkov
S.D. Fedotov
A.Yu. Zakrevsky
author_sort A.V. Ulybin
title Inspection of pile foundation before constructing additional storeys оn existing buildings
title_short Inspection of pile foundation before constructing additional storeys оn existing buildings
title_full Inspection of pile foundation before constructing additional storeys оn existing buildings
title_fullStr Inspection of pile foundation before constructing additional storeys оn existing buildings
title_full_unstemmed Inspection of pile foundation before constructing additional storeys оn existing buildings
title_sort inspection of pile foundation before constructing additional storeys оn existing buildings
publisher Peter the Great St. Petersburg Polytechnic University
series Инженерно-строительный журнал
issn 2071-4726
2071-0305
publishDate 2014-06-01
description The problem of constructing additional storeys on existing buildings is really up-to-date nowadays. Implementation of the above-mentioned process should be undertaken after the inspection of constructions. Foundation is the construction which takes additional loads. The inspection of constructions, which are located underground, i.e. piles, is a very complicated technical problem. This article considers the full inspection of the pile foundation, analysis of mistakes in the geological survey and ways of their elimination. The results of determining a bearing capacity of piles were described using three different methods: calculation, static penetration test, in-situ load tests were compared. The paper shows the essential difference between the results obtained by using different methods. The analysis of the survey’s results contributes to drawing up recommendations on the methodology of the pile foundation complex inspection.
topic inspection of buildings
excavation of test pits
bearing capacity of piles
construction of additional storeys
url http://engstroy.spb.ru/eng/index_2014_04/03.html
work_keys_str_mv AT avulybin inspectionofpilefoundationbeforeconstructingadditionalstoreysonexistingbuildings
AT svzubkov inspectionofpilefoundationbeforeconstructingadditionalstoreysonexistingbuildings
AT sdfedotov inspectionofpilefoundationbeforeconstructingadditionalstoreysonexistingbuildings
AT ayuzakrevsky inspectionofpilefoundationbeforeconstructingadditionalstoreysonexistingbuildings
_version_ 1725157822012850176