AN ANALYSIS OF CHOSEN ASPECTS OF ENVIROMENT-RELATED CONDITIONS FOR BUILDING INVESTMENTS

The construction of building projects will always result in a degree of interference in the local environment. Legal regulations intended for the most effective protection of natural resources foresee a range of procedures, without which the initation of building projects is not possible. It concer...

Full description

Bibliographic Details
Main Authors: Jolanta Harasymiuk, Elżbieta Hanna Szafranko
Format: Article
Language:English
Published: Polish Society of Ecological Engineering (PTIE) 2017-09-01
Series:Journal of Ecological Engineering
Subjects:
Online Access:http://www.journalssystem.com/jeeng/AN-ANALYSIS-OF-CHOSEN-ASPECTS-OF-ENVIROMENT-RELATED-CONDITIONS-FOR-BUILDING-INVESTMENTS,75385,0,2.html
id doaj-56a269d450984d3aa5c6628cb018fce9
record_format Article
spelling doaj-56a269d450984d3aa5c6628cb018fce92020-11-24T21:24:54ZengPolish Society of Ecological Engineering (PTIE)Journal of Ecological Engineering2299-89932017-09-01185828910.12911/22998993/7538575385AN ANALYSIS OF CHOSEN ASPECTS OF ENVIROMENT-RELATED CONDITIONS FOR BUILDING INVESTMENTSJolanta Harasymiuk0Elżbieta Hanna Szafranko1University of Warmia and Mazury in Olsztyn, Faculty of Geodesy, Geospatial and Civil Engineering, Institute of Building Engineering, Heweliusza str. 4, 10-724 Olsztyn, PolandUniversity of Warmia and Mazury in Olsztyn, Faculty of Geodesy, Geospatial and Civil Engineering, Institute of Building Engineering, Heweliusza str. 4, 10-724 Olsztyn, PolandThe construction of building projects will always result in a degree of interference in the local environment. Legal regulations intended for the most effective protection of natural resources foresee a range of procedures, without which the initation of building projects is not possible. It concerns all investments, but the regulations especially emphasize these, which may negatively affect the environment. A decision on environment-related conditions, which is foressen in the process, requires the preparation of many specialist documents which constitute attachments to the application of its issuance. One of the problems related to this procedure is the time lag associated with an environmental decision, which is difficult to determine or predict. In the article the periods of waiting for issuing a decision for building investments of a different character were analysed. The reason for this situation was also analyzed.http://www.journalssystem.com/jeeng/AN-ANALYSIS-OF-CHOSEN-ASPECTS-OF-ENVIROMENT-RELATED-CONDITIONS-FOR-BUILDING-INVESTMENTS,75385,0,2.htmlinvestment activitiesenvironmental protectionenvironmental decision
collection DOAJ
language English
format Article
sources DOAJ
author Jolanta Harasymiuk
Elżbieta Hanna Szafranko
spellingShingle Jolanta Harasymiuk
Elżbieta Hanna Szafranko
AN ANALYSIS OF CHOSEN ASPECTS OF ENVIROMENT-RELATED CONDITIONS FOR BUILDING INVESTMENTS
Journal of Ecological Engineering
investment activities
environmental protection
environmental decision
author_facet Jolanta Harasymiuk
Elżbieta Hanna Szafranko
author_sort Jolanta Harasymiuk
title AN ANALYSIS OF CHOSEN ASPECTS OF ENVIROMENT-RELATED CONDITIONS FOR BUILDING INVESTMENTS
title_short AN ANALYSIS OF CHOSEN ASPECTS OF ENVIROMENT-RELATED CONDITIONS FOR BUILDING INVESTMENTS
title_full AN ANALYSIS OF CHOSEN ASPECTS OF ENVIROMENT-RELATED CONDITIONS FOR BUILDING INVESTMENTS
title_fullStr AN ANALYSIS OF CHOSEN ASPECTS OF ENVIROMENT-RELATED CONDITIONS FOR BUILDING INVESTMENTS
title_full_unstemmed AN ANALYSIS OF CHOSEN ASPECTS OF ENVIROMENT-RELATED CONDITIONS FOR BUILDING INVESTMENTS
title_sort analysis of chosen aspects of enviroment-related conditions for building investments
publisher Polish Society of Ecological Engineering (PTIE)
series Journal of Ecological Engineering
issn 2299-8993
publishDate 2017-09-01
description The construction of building projects will always result in a degree of interference in the local environment. Legal regulations intended for the most effective protection of natural resources foresee a range of procedures, without which the initation of building projects is not possible. It concerns all investments, but the regulations especially emphasize these, which may negatively affect the environment. A decision on environment-related conditions, which is foressen in the process, requires the preparation of many specialist documents which constitute attachments to the application of its issuance. One of the problems related to this procedure is the time lag associated with an environmental decision, which is difficult to determine or predict. In the article the periods of waiting for issuing a decision for building investments of a different character were analysed. The reason for this situation was also analyzed.
topic investment activities
environmental protection
environmental decision
url http://www.journalssystem.com/jeeng/AN-ANALYSIS-OF-CHOSEN-ASPECTS-OF-ENVIROMENT-RELATED-CONDITIONS-FOR-BUILDING-INVESTMENTS,75385,0,2.html
work_keys_str_mv AT jolantaharasymiuk ananalysisofchosenaspectsofenviromentrelatedconditionsforbuildinginvestments
AT elzbietahannaszafranko ananalysisofchosenaspectsofenviromentrelatedconditionsforbuildinginvestments
AT jolantaharasymiuk analysisofchosenaspectsofenviromentrelatedconditionsforbuildinginvestments
AT elzbietahannaszafranko analysisofchosenaspectsofenviromentrelatedconditionsforbuildinginvestments
_version_ 1725986216137981952