A Novel Hybrid MCDM Procedure for Achieving Aspired Earned Value Project Performance
A better-performing project gains more subsequent businesses. Many organizations worldwide apply an earned value management (EVM) system to monitor and control their projects’ performance. However, a successful EVM application requires handling multiple interinfluenced criteria with feedback effects...
Main Authors: | Shou-Yan Chou, Chien-Chou Yu, Gwo-Hshiung Tzeng |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2016-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2016/9721726 |
Similar Items
-
A Novel Hybrid MCDM Procedure for Achieving Aspired Earned Value Project Performance
by: Chien-Chou Yu, et al.
Published: (2016) -
Applying a Hybrid MCDM Model for Six Sigma Project Selection
by: Fu-Kwun Wang, et al.
Published: (2014-01-01) -
Improving Sustainable Mobile Health Care Promotion: A Novel Hybrid MCDM Method
by: Yupeng Liu, et al.
Published: (2019-01-01) -
Comments on “Multiple criteria decision making (MCDM) methods in economics: an overview”
by: James J. H. Liou, et al.
Published: (2012-12-01) -
Erratum on the article ‘Comments on “multiple criteria decision making (MCDM) methods in economics”: an overview’ (DOI: 10.3846/20294913.2012.753489)
by: James J. H. Liou, et al.
Published: (2013-04-01)