Machine Learning-Based Prediction of Missing Components for Assembly – a Case Study at an Engineer-to-Order Manufacturer
For manufacturing companies, especially for machine and plant manufacturers, the assembly of products in time has an essential impact on meeting delivery dates. Often missing individual components lead to a delayed assembly start, hereinafter referred to as <italic>assembly start delayers</...
Main Authors: | Peter Burggraf, Johannes Wagner, Benjamin Heinbach, Fabian Steinberg |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2021-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9416418/ |
Similar Items
-
Approaches for the Prediction of Lead Times in an Engineer to Order Environment—A Systematic Review
by: Peter Burggraf, et al.
Published: (2020-01-01) -
Bibliometric Study on the Use of Machine Learning as Resolution Technique for Facility Layout Problems
by: Peter Burggraf, et al.
Published: (2021-01-01) -
Development of physics-based reduced-order models for reacting flow applications
by: Aversano, Gianmarco
Published: (2019) -
Influence of Missing Values Substitutes on Multivariate Analysis of Metabolomics Data
by: Piotr S. Gromski, et al.
Published: (2014-06-01) -
Machine Learning for Additive Manufacturing
by: Dean Grierson, et al.
Published: (2021-07-01)