Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
The methodology of development of building project schedules, proposed in the article, is based on an attempt to combine two independent approaches in order to increase the probability of fulfillment of time limits planned in the CPM schedules during the performance of construction works. The analy...
Main Author: | Mieczysław Połoński |
---|---|
Format: | Article |
Language: | English |
Published: |
Lublin University of Technology
2013-03-01
|
Series: | Budownictwo i Architektura |
Subjects: | |
Online Access: | https://ph.pollub.pl/index.php/bia/article/view/2164 |
Similar Items
-
Impact of Baseline Terms on the Course of Critical Paths and Time Buffers in the Modified Goldratt’s Method
by: Połoński M., et al.
Published: (2013-09-01) -
Construction project budgeting including time buffers and costs
by: Mieczysław Połoński
Published: (2014-12-01) -
Estudio del efecto de la estimación del tiempo y el tamaño del búfer de proyecto en el Método de la Cadena Crítica = Study of the effect of tasks duration and project buffer size estimation in the Critical Chain Method
by: Joaquín Fuentes, et al.
Published: (2019-04-01) -
Construction Scheduling using Critical Path Analysis with Separate Time Segments
by: Menesi, Wail
Published: (2010) -
Construction Scheduling using Critical Path Analysis with Separate Time Segments
by: Menesi, Wail
Published: (2010)