Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis

The methodology of development of building project schedules, proposed in the article, is based on an attempt to combine two independent approaches in order to increase the probability of fulfillment of time limits planned in the CPM schedules during the performance of construction works. The analy...

Full description

Bibliographic Details
Main Author: Mieczysław Połoński
Format: Article
Language:English
Published: Lublin University of Technology 2013-03-01
Series:Budownictwo i Architektura
Subjects:
Online Access:https://ph.pollub.pl/index.php/bia/article/view/2164
id doaj-562f2eb3031944a4a4033c26479ceef8
record_format Article
spelling doaj-562f2eb3031944a4a4033c26479ceef82020-11-25T03:18:52ZengLublin University of TechnologyBudownictwo i Architektura1899-06652544-32752013-03-0112110.35784/bud-arch.2164Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis Mieczysław Połoński0Department of Geotechnical Engineering, Faculty of Civil and Environmental Engineering, Warsaw University of Life Sciences – SGGW The methodology of development of building project schedules, proposed in the article, is based on an attempt to combine two independent approaches in order to increase the probability of fulfillment of time limits planned in the CPM schedules during the performance of construction works. The analysis of the risk associated with the planned building project will allow for the determination of those tasks which are most threatened by the exceeding of the planned duration time. The application of time buffers, their proper location in the schedule and the determination of their duration, taking into account the expected risk of delays, allow to develop the schedules that contain the appropriate time reserves to compensating for the possible delays. Such a schedule may serve not only as a reliable basis for the determination of the expected deadline for completion of construction works, but also for the management of these works during performance. Selected components of MOCRA and MP-KP methods were proposed in the article. https://ph.pollub.pl/index.php/bia/article/view/2164CPM scheduleproject bufferrisk analysisGoldratt’s methodcritical pathprogress work monitoring
collection DOAJ
language English
format Article
sources DOAJ
author Mieczysław Połoński
spellingShingle Mieczysław Połoński
Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
Budownictwo i Architektura
CPM schedule
project buffer
risk analysis
Goldratt’s method
critical path
progress work monitoring
author_facet Mieczysław Połoński
author_sort Mieczysław Połoński
title Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
title_short Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
title_full Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
title_fullStr Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
title_full_unstemmed Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
title_sort scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
publisher Lublin University of Technology
series Budownictwo i Architektura
issn 1899-0665
2544-3275
publishDate 2013-03-01
description The methodology of development of building project schedules, proposed in the article, is based on an attempt to combine two independent approaches in order to increase the probability of fulfillment of time limits planned in the CPM schedules during the performance of construction works. The analysis of the risk associated with the planned building project will allow for the determination of those tasks which are most threatened by the exceeding of the planned duration time. The application of time buffers, their proper location in the schedule and the determination of their duration, taking into account the expected risk of delays, allow to develop the schedules that contain the appropriate time reserves to compensating for the possible delays. Such a schedule may serve not only as a reliable basis for the determination of the expected deadline for completion of construction works, but also for the management of these works during performance. Selected components of MOCRA and MP-KP methods were proposed in the article.
topic CPM schedule
project buffer
risk analysis
Goldratt’s method
critical path
progress work monitoring
url https://ph.pollub.pl/index.php/bia/article/view/2164
work_keys_str_mv AT mieczysławpołonski schedulingofbuildingprojectstakingintoaccountthetimebuffersdeterminedonthebasisofriskanalysis
_version_ 1724625351644020736