Pilot plant for exploitation of geothermal waters

In Sijarinska spa, there are some 15 mineral and thermomineral springs, that are already being used for therapeutic purposes. For the exploitation of heat energy boring B-4 is very interesting. It is a boring of a closed type, with the water temperature of about 78°C and a flow rate of about 33 l/s....

Full description

Bibliographic Details
Main Authors: Stojiljković Dragan T., Stojiljković Staniša T., Mitić Nebojša Č., Pejić Dragan M., Đurović-Petrović Maja
Format: Article
Language:English
Published: VINCA Institute of Nuclear Sciences 2006-01-01
Series:Thermal Science
Subjects:
Online Access:http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604195S.pdf
id doaj-5560b2d83f044ce688d6bad00ce28fc2
record_format Article
spelling doaj-5560b2d83f044ce688d6bad00ce28fc22021-01-02T08:52:45ZengVINCA Institute of Nuclear SciencesThermal Science0354-98362334-71632006-01-0110419520310.2298/TSCI0604195S0354-98360604195SPilot plant for exploitation of geothermal watersStojiljković Dragan T.0Stojiljković Staniša T.1Mitić Nebojša Č.2Pejić Dragan M.3Đurović-Petrović Maja4Faculty for Technology, LeskovacFaculty for Technology, LeskovacFaculty for Technology, LeskovacFaculty for Technology, LeskovacMinistry for Sciences and Environmental Protection of the Republic of SerbiaIn Sijarinska spa, there are some 15 mineral and thermomineral springs, that are already being used for therapeutic purposes. For the exploitation of heat energy boring B-4 is very interesting. It is a boring of a closed type, with the water temperature of about 78°C and a flow rate of about 33 l/s. Waters with the flow rate of about 6 l/s are currently used for heating of the Gejzer hotel, and waters of the flow rate of about 0,121 l/s for the pilot drying plant. The paper presents this pilot plant. .http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604195S.pdfgeothermal waterheat energydryingpilot plant
collection DOAJ
language English
format Article
sources DOAJ
author Stojiljković Dragan T.
Stojiljković Staniša T.
Mitić Nebojša Č.
Pejić Dragan M.
Đurović-Petrović Maja
spellingShingle Stojiljković Dragan T.
Stojiljković Staniša T.
Mitić Nebojša Č.
Pejić Dragan M.
Đurović-Petrović Maja
Pilot plant for exploitation of geothermal waters
Thermal Science
geothermal water
heat energy
drying
pilot plant
author_facet Stojiljković Dragan T.
Stojiljković Staniša T.
Mitić Nebojša Č.
Pejić Dragan M.
Đurović-Petrović Maja
author_sort Stojiljković Dragan T.
title Pilot plant for exploitation of geothermal waters
title_short Pilot plant for exploitation of geothermal waters
title_full Pilot plant for exploitation of geothermal waters
title_fullStr Pilot plant for exploitation of geothermal waters
title_full_unstemmed Pilot plant for exploitation of geothermal waters
title_sort pilot plant for exploitation of geothermal waters
publisher VINCA Institute of Nuclear Sciences
series Thermal Science
issn 0354-9836
2334-7163
publishDate 2006-01-01
description In Sijarinska spa, there are some 15 mineral and thermomineral springs, that are already being used for therapeutic purposes. For the exploitation of heat energy boring B-4 is very interesting. It is a boring of a closed type, with the water temperature of about 78°C and a flow rate of about 33 l/s. Waters with the flow rate of about 6 l/s are currently used for heating of the Gejzer hotel, and waters of the flow rate of about 0,121 l/s for the pilot drying plant. The paper presents this pilot plant. .
topic geothermal water
heat energy
drying
pilot plant
url http://www.doiserbia.nb.rs/img/doi/0354-9836/2006/0354-98360604195S.pdf
work_keys_str_mv AT stojiljkovicdragant pilotplantforexploitationofgeothermalwaters
AT stojiljkovicstanisat pilotplantforexploitationofgeothermalwaters
AT miticnebojsac pilotplantforexploitationofgeothermalwaters
AT pejicdraganm pilotplantforexploitationofgeothermalwaters
AT đurovicpetrovicmaja pilotplantforexploitationofgeothermalwaters
_version_ 1724356396358565888