A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module
Despite the international trend of actively utilizing BIM in the field of energy simulation, it is difficult to actively utilize BIM in domestic certification-related practice. As a result, the work process is not integrated and the work efficiency is reduced, such as the occurrence of redundant tas...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-06-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/12/13/2461 |
id |
doaj-5507202783d74a8da2e4afd0963d0441 |
---|---|
record_format |
Article |
spelling |
doaj-5507202783d74a8da2e4afd0963d04412020-11-25T00:29:17ZengMDPI AGEnergies1996-10732019-06-011213246110.3390/en12132461en12132461A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry ModuleJun-Woo Choi0Yong-Joon Jun1Jin-ha Yoon2Young-hak Song3Kyung-Soon Park4Smart Greenbuilding Lab, EAN Technology, 06159 Seoul, KoreaDepartment of Architectural Engineering, Dong-Eui University, Busan 47340, KoreaSmart Greenbuilding Lab, EAN Technology, 06159 Seoul, KoreaDepartment of Architectural Engineering, ERI, Gyeongsang National University, Jinju 52828, KoreaArchitectural Engineering Major, Division of Urban, Architecture and Civil Engineering, Dong-Eui University, Busan 47340, KoreaDespite the international trend of actively utilizing BIM in the field of energy simulation, it is difficult to actively utilize BIM in domestic certification-related practice. As a result, the work process is not integrated and the work efficiency is reduced, such as the occurrence of redundant tasks. In this paper, the integrated process based on the BIM geometry information automated extraction module was presented and its effectiveness was reviewed and verified through self-developed automation module and uniformity and error-causing analysis. The construction of an integrated process through automatic configuration information extraction has the advantages of reducing the workload, enabling additional tasks through module function expansion, sharing information through the web, and ease of service manufacture. In addition, an experiment comparing the data of automatic and manual calculations with three subjects confirmed that automatic calculation database through automation module can produce a more reliable and uniform database with a lower proportion of human error than the manual calculation module. This not only improves the reliability of the energy simulation itself, but also reduces the human and temporal loads that occur during the post-simulation data verification process.https://www.mdpi.com/1996-1073/12/13/2461building information modelingautomationinteroperabilityspatial informationautomatic extraction |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Jun-Woo Choi Yong-Joon Jun Jin-ha Yoon Young-hak Song Kyung-Soon Park |
spellingShingle |
Jun-Woo Choi Yong-Joon Jun Jin-ha Yoon Young-hak Song Kyung-Soon Park A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module Energies building information modeling automation interoperability spatial information automatic extraction |
author_facet |
Jun-Woo Choi Yong-Joon Jun Jin-ha Yoon Young-hak Song Kyung-Soon Park |
author_sort |
Jun-Woo Choi |
title |
A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module |
title_short |
A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module |
title_full |
A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module |
title_fullStr |
A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module |
title_full_unstemmed |
A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module |
title_sort |
study of energy simulation integrated process by automated extraction module of the bim geometry module |
publisher |
MDPI AG |
series |
Energies |
issn |
1996-1073 |
publishDate |
2019-06-01 |
description |
Despite the international trend of actively utilizing BIM in the field of energy simulation, it is difficult to actively utilize BIM in domestic certification-related practice. As a result, the work process is not integrated and the work efficiency is reduced, such as the occurrence of redundant tasks. In this paper, the integrated process based on the BIM geometry information automated extraction module was presented and its effectiveness was reviewed and verified through self-developed automation module and uniformity and error-causing analysis. The construction of an integrated process through automatic configuration information extraction has the advantages of reducing the workload, enabling additional tasks through module function expansion, sharing information through the web, and ease of service manufacture. In addition, an experiment comparing the data of automatic and manual calculations with three subjects confirmed that automatic calculation database through automation module can produce a more reliable and uniform database with a lower proportion of human error than the manual calculation module. This not only improves the reliability of the energy simulation itself, but also reduces the human and temporal loads that occur during the post-simulation data verification process. |
topic |
building information modeling automation interoperability spatial information automatic extraction |
url |
https://www.mdpi.com/1996-1073/12/13/2461 |
work_keys_str_mv |
AT junwoochoi astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT yongjoonjun astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT jinhayoon astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT younghaksong astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT kyungsoonpark astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT junwoochoi studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT yongjoonjun studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT jinhayoon studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT younghaksong studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule AT kyungsoonpark studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule |
_version_ |
1725332215215161344 |