A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module

Despite the international trend of actively utilizing BIM in the field of energy simulation, it is difficult to actively utilize BIM in domestic certification-related practice. As a result, the work process is not integrated and the work efficiency is reduced, such as the occurrence of redundant tas...

Full description

Bibliographic Details
Main Authors: Jun-Woo Choi, Yong-Joon Jun, Jin-ha Yoon, Young-hak Song, Kyung-Soon Park
Format: Article
Language:English
Published: MDPI AG 2019-06-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/12/13/2461
id doaj-5507202783d74a8da2e4afd0963d0441
record_format Article
spelling doaj-5507202783d74a8da2e4afd0963d04412020-11-25T00:29:17ZengMDPI AGEnergies1996-10732019-06-011213246110.3390/en12132461en12132461A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry ModuleJun-Woo Choi0Yong-Joon Jun1Jin-ha Yoon2Young-hak Song3Kyung-Soon Park4Smart Greenbuilding Lab, EAN Technology, 06159 Seoul, KoreaDepartment of Architectural Engineering, Dong-Eui University, Busan 47340, KoreaSmart Greenbuilding Lab, EAN Technology, 06159 Seoul, KoreaDepartment of Architectural Engineering, ERI, Gyeongsang National University, Jinju 52828, KoreaArchitectural Engineering Major, Division of Urban, Architecture and Civil Engineering, Dong-Eui University, Busan 47340, KoreaDespite the international trend of actively utilizing BIM in the field of energy simulation, it is difficult to actively utilize BIM in domestic certification-related practice. As a result, the work process is not integrated and the work efficiency is reduced, such as the occurrence of redundant tasks. In this paper, the integrated process based on the BIM geometry information automated extraction module was presented and its effectiveness was reviewed and verified through self-developed automation module and uniformity and error-causing analysis. The construction of an integrated process through automatic configuration information extraction has the advantages of reducing the workload, enabling additional tasks through module function expansion, sharing information through the web, and ease of service manufacture. In addition, an experiment comparing the data of automatic and manual calculations with three subjects confirmed that automatic calculation database through automation module can produce a more reliable and uniform database with a lower proportion of human error than the manual calculation module. This not only improves the reliability of the energy simulation itself, but also reduces the human and temporal loads that occur during the post-simulation data verification process.https://www.mdpi.com/1996-1073/12/13/2461building information modelingautomationinteroperabilityspatial informationautomatic extraction
collection DOAJ
language English
format Article
sources DOAJ
author Jun-Woo Choi
Yong-Joon Jun
Jin-ha Yoon
Young-hak Song
Kyung-Soon Park
spellingShingle Jun-Woo Choi
Yong-Joon Jun
Jin-ha Yoon
Young-hak Song
Kyung-Soon Park
A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module
Energies
building information modeling
automation
interoperability
spatial information
automatic extraction
author_facet Jun-Woo Choi
Yong-Joon Jun
Jin-ha Yoon
Young-hak Song
Kyung-Soon Park
author_sort Jun-Woo Choi
title A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module
title_short A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module
title_full A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module
title_fullStr A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module
title_full_unstemmed A Study of Energy Simulation Integrated Process by Automated Extraction Module of the BIM Geometry Module
title_sort study of energy simulation integrated process by automated extraction module of the bim geometry module
publisher MDPI AG
series Energies
issn 1996-1073
publishDate 2019-06-01
description Despite the international trend of actively utilizing BIM in the field of energy simulation, it is difficult to actively utilize BIM in domestic certification-related practice. As a result, the work process is not integrated and the work efficiency is reduced, such as the occurrence of redundant tasks. In this paper, the integrated process based on the BIM geometry information automated extraction module was presented and its effectiveness was reviewed and verified through self-developed automation module and uniformity and error-causing analysis. The construction of an integrated process through automatic configuration information extraction has the advantages of reducing the workload, enabling additional tasks through module function expansion, sharing information through the web, and ease of service manufacture. In addition, an experiment comparing the data of automatic and manual calculations with three subjects confirmed that automatic calculation database through automation module can produce a more reliable and uniform database with a lower proportion of human error than the manual calculation module. This not only improves the reliability of the energy simulation itself, but also reduces the human and temporal loads that occur during the post-simulation data verification process.
topic building information modeling
automation
interoperability
spatial information
automatic extraction
url https://www.mdpi.com/1996-1073/12/13/2461
work_keys_str_mv AT junwoochoi astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT yongjoonjun astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT jinhayoon astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT younghaksong astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT kyungsoonpark astudyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT junwoochoi studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT yongjoonjun studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT jinhayoon studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT younghaksong studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
AT kyungsoonpark studyofenergysimulationintegratedprocessbyautomatedextractionmoduleofthebimgeometrymodule
_version_ 1725332215215161344