Critical path analysis programming method without network diagram
Project scheduling is an important task in project management which monitors the project duration, resource utilization and affects the benefit of project for all kinds of project such as construction, IT, renewable energy, product design and manufacturing etc. Among many methods for project managem...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://www.matec-conferences.org/articles/matecconf/pdf/2018/51/matecconf_iceast2018_01027.pdf |
id |
doaj-53259e6d6431467eacd1dc6eed80f9f7 |
---|---|
record_format |
Article |
spelling |
doaj-53259e6d6431467eacd1dc6eed80f9f72021-04-02T12:20:45ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011920102710.1051/matecconf/201819201027matecconf_iceast2018_01027Critical path analysis programming method without network diagramHein Soe Paing0Min Htike Thein1Department of Mechanical Engineering, Yangon Technological UniversityDepartment of Mechanical Engineering, Yangon Technological UniversityProject scheduling is an important task in project management which monitors the project duration, resource utilization and affects the benefit of project for all kinds of project such as construction, IT, renewable energy, product design and manufacturing etc. Among many methods for project management, critical path method (CPM) is one of the better-known planning and control techniques in project scheduling. In this study, CPM-based computerized program was developed together with modeling of step by step calculations of parameters of interest such as earliest starts and finishes, slack and float times of project activities resulting in determination of critical path for the project. One advantage of computer implementation of CPM using MATLAB in this study is that unlike conventional method, it eliminates necessity to conventionally draw network diagram to perform critical path analysis.https://www.matec-conferences.org/articles/matecconf/pdf/2018/51/matecconf_iceast2018_01027.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Hein Soe Paing Min Htike Thein |
spellingShingle |
Hein Soe Paing Min Htike Thein Critical path analysis programming method without network diagram MATEC Web of Conferences |
author_facet |
Hein Soe Paing Min Htike Thein |
author_sort |
Hein Soe Paing |
title |
Critical path analysis programming method without network diagram |
title_short |
Critical path analysis programming method without network diagram |
title_full |
Critical path analysis programming method without network diagram |
title_fullStr |
Critical path analysis programming method without network diagram |
title_full_unstemmed |
Critical path analysis programming method without network diagram |
title_sort |
critical path analysis programming method without network diagram |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2018-01-01 |
description |
Project scheduling is an important task in project management which monitors the project duration, resource utilization and affects the benefit of project for all kinds of project such as construction, IT, renewable energy, product design and manufacturing etc. Among many methods for project management, critical path method (CPM) is one of the better-known planning and control techniques in project scheduling. In this study, CPM-based computerized program was developed together with modeling of step by step calculations of parameters of interest such as earliest starts and finishes, slack and float times of project activities resulting in determination of critical path for the project. One advantage of computer implementation of CPM using MATLAB in this study is that unlike conventional method, it eliminates necessity to conventionally draw network diagram to perform critical path analysis. |
url |
https://www.matec-conferences.org/articles/matecconf/pdf/2018/51/matecconf_iceast2018_01027.pdf |
work_keys_str_mv |
AT heinsoepaing criticalpathanalysisprogrammingmethodwithoutnetworkdiagram AT minhtikethein criticalpathanalysisprogrammingmethodwithoutnetworkdiagram |
_version_ |
1721569343128469504 |