Evaluation of the Establishment of the Emergency Management System Based on Health, Safety, and the Environment Management System and Oil and Gas Producers Standards
Background Emergency action plans and procedures importance in occupational health issues in Iran's industry. Objective Research was conducted to evaluate the emergency action plan based on HSE-MS standards. Methods This article is a cross-sectional descriptive-analytic study that was conduc...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Qazvin University of Medical Sciences & Health Services
2019-04-01
|
Series: | The Journal of Qazvin University of Medical Sciences |
Subjects: | |
Online Access: | http://journal.qums.ac.ir/article-1-2684-en.html |
id |
doaj-52fbbfc91ecb42698ac54aa18567eb03 |
---|---|
record_format |
Article |
spelling |
doaj-52fbbfc91ecb42698ac54aa18567eb032020-11-25T02:06:05ZfasQazvin University of Medical Sciences & Health ServicesThe Journal of Qazvin University of Medical Sciences1561-36662228-72132019-04-01231748310.32598/JQUMS.23.1.74Evaluation of the Establishment of the Emergency Management System Based on Health, Safety, and the Environment Management System and Oil and Gas Producers StandardsAtefeh KheirkhahReza Gholamnia0Amir KavousiDepartment of Health, Safety and Environment, School of Public Health and Safety, Shahid Beheshti university of Medical Sciences, Tehran, IranBackground Emergency action plans and procedures importance in occupational health issues in Iran's industry. Objective Research was conducted to evaluate the emergency action plan based on HSE-MS standards. Methods This article is a cross-sectional descriptive-analytic study that was conducted in a large food industry company in 2017. A questionnaire was designed and used based on HSE-MS and OGP standard for providing an emergency response plan. Validity index: CVR: 0.83, CVI: 0.98. Cronbach's alpha was adopted to test reliability α:0.88 for ERP questionnaire and α:0.93 for knowledge questionnaire, both reliability and validity were acceptable. Risk assessment was performed by the FMEA method, and the result was analyzed. Findings Questionnaire analysis showed that 73% frequency of response was yes, which can be acceptable. Also, the system failure point based on the questionnaire was determined by determining severity, frequency, and detection probability, 436 activity was evaluated. The result showed that 28 of the risk with a priority number of over 300 and 58 risks were above the risk level of 150 and 13 risks were risky at a critical level. (two risk factor higher than 6). Conclusion Noncompliance cases were in the design and planning scenarios of emergency and relief and rescue instruction. Therefore training program and operational maneuvers for ammonia chamber room, CIP+CBH chemical storage depot and boiler had a high priority for the highest risk program indicators.http://journal.qums.ac.ir/article-1-2684-en.htmlEmergency managementHSE-MSFM & EAOGP |
collection |
DOAJ |
language |
fas |
format |
Article |
sources |
DOAJ |
author |
Atefeh Kheirkhah Reza Gholamnia Amir Kavousi |
spellingShingle |
Atefeh Kheirkhah Reza Gholamnia Amir Kavousi Evaluation of the Establishment of the Emergency Management System Based on Health, Safety, and the Environment Management System and Oil and Gas Producers Standards The Journal of Qazvin University of Medical Sciences Emergency management HSE-MS FM & EA OGP |
author_facet |
Atefeh Kheirkhah Reza Gholamnia Amir Kavousi |
author_sort |
Atefeh Kheirkhah |
title |
Evaluation of the Establishment of the Emergency Management System Based on Health, Safety, and the Environment Management System and Oil and Gas Producers Standards |
title_short |
Evaluation of the Establishment of the Emergency Management System Based on Health, Safety, and the Environment Management System and Oil and Gas Producers Standards |
title_full |
Evaluation of the Establishment of the Emergency Management System Based on Health, Safety, and the Environment Management System and Oil and Gas Producers Standards |
title_fullStr |
Evaluation of the Establishment of the Emergency Management System Based on Health, Safety, and the Environment Management System and Oil and Gas Producers Standards |
title_full_unstemmed |
Evaluation of the Establishment of the Emergency Management System Based on Health, Safety, and the Environment Management System and Oil and Gas Producers Standards |
title_sort |
evaluation of the establishment of the emergency management system based on health, safety, and the environment management system and oil and gas producers standards |
publisher |
Qazvin University of Medical Sciences & Health Services |
series |
The Journal of Qazvin University of Medical Sciences |
issn |
1561-3666 2228-7213 |
publishDate |
2019-04-01 |
description |
Background Emergency action plans and procedures importance in occupational health issues in Iran's
industry.
Objective Research was conducted to evaluate the emergency action plan based on HSE-MS standards.
Methods This article is a cross-sectional descriptive-analytic study that was conducted in a large food
industry company in 2017. A questionnaire was designed and used based on HSE-MS and OGP standard
for providing an emergency response plan. Validity index: CVR: 0.83, CVI: 0.98. Cronbach's alpha was
adopted to test reliability α:0.88 for ERP questionnaire and α:0.93 for knowledge questionnaire, both
reliability and validity were acceptable. Risk assessment was performed by the FMEA method, and the
result was analyzed.
Findings Questionnaire analysis showed that 73% frequency of response was yes, which can be acceptable.
Also, the system failure point based on the questionnaire was determined by determining severity,
frequency, and detection probability, 436 activity was evaluated. The result showed that 28 of the risk
with a priority number of over 300 and 58 risks were above the risk level of 150 and 13 risks were risky
at a critical level. (two risk factor higher than 6).
Conclusion Noncompliance cases were in the design and planning scenarios of emergency and relief and
rescue instruction. Therefore training program and operational maneuvers for ammonia chamber room,
CIP+CBH chemical storage depot and boiler had a high priority for the highest risk program indicators. |
topic |
Emergency management HSE-MS FM & EA OGP |
url |
http://journal.qums.ac.ir/article-1-2684-en.html |
work_keys_str_mv |
AT atefehkheirkhah evaluationoftheestablishmentoftheemergencymanagementsystembasedonhealthsafetyandtheenvironmentmanagementsystemandoilandgasproducersstandards AT rezagholamnia evaluationoftheestablishmentoftheemergencymanagementsystembasedonhealthsafetyandtheenvironmentmanagementsystemandoilandgasproducersstandards AT amirkavousi evaluationoftheestablishmentoftheemergencymanagementsystembasedonhealthsafetyandtheenvironmentmanagementsystemandoilandgasproducersstandards |
_version_ |
1724935207847460864 |