Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns

The so-called “Hang's Mudding-off” technique is critical to keeping the dynamic pressure balance and guaranteeing the sufficient safe operation time in wellbore. However, for lack of dynamic mathematical model analysis methods for reflecting the changes of annulus liquid level in the borehole d...

Full description

Bibliographic Details
Main Authors: Huixin Liu, Dongchang Fan, Pu Liu
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2016-11-01
Series:Natural Gas Industry B
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2352854017300153
id doaj-50dc56bb390d4741a2688dde4f48013a
record_format Article
spelling doaj-50dc56bb390d4741a2688dde4f48013a2021-04-02T09:54:50ZengKeAi Communications Co., Ltd.Natural Gas Industry B2352-85402016-11-013546747110.1016/j.ngib.2016.09.002Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returnsHuixin LiuDongchang FanPu LiuThe so-called “Hang's Mudding-off” technique is critical to keeping the dynamic pressure balance and guaranteeing the sufficient safe operation time in wellbore. However, for lack of dynamic mathematical model analysis methods for reflecting the changes of annulus liquid level in the borehole during the “Hang's Mudding-off” operation, the actual operation is basically conducted blindly without reasonable engineering basis. According to the actual conditions, a mathematical model for the safe time of the “Hang's Mudding-off” was, for the first time, built up by using the dynamic borehole leakage analysis method. Then, the integral results of leak-off rates were calculated. Finally, the calculation results were verified by field cases. It is shown that the calculation results are highly accordant with the actual data, indicating the reliability of the mathematical model. The safe operation time can be increased by increasing mud amount or reducing mud density appropriately. With this model, the safe time of “Hang's Mudding-off” operation can be calculated accurately. This research result is of great significance to avoiding well control risk of absorption wells, optimizing the “Hang's Mudding-off” technique and reducing project cost.http://www.sciencedirect.com/science/article/pii/S2352854017300153Pressure controlCirculation loss of returns“Hang's Mudding-off” techniqueLiquid level monitoringMathematical modelDynamic pressure balanceSafe timeLeak-off rate
collection DOAJ
language English
format Article
sources DOAJ
author Huixin Liu
Dongchang Fan
Pu Liu
spellingShingle Huixin Liu
Dongchang Fan
Pu Liu
Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns
Natural Gas Industry B
Pressure control
Circulation loss of returns
“Hang's Mudding-off” technique
Liquid level monitoring
Mathematical model
Dynamic pressure balance
Safe time
Leak-off rate
author_facet Huixin Liu
Dongchang Fan
Pu Liu
author_sort Huixin Liu
title Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns
title_short Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns
title_full Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns
title_fullStr Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns
title_full_unstemmed Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns
title_sort safety time calculation method for “hang's mudding-off” operation under circulation loss of returns
publisher KeAi Communications Co., Ltd.
series Natural Gas Industry B
issn 2352-8540
publishDate 2016-11-01
description The so-called “Hang's Mudding-off” technique is critical to keeping the dynamic pressure balance and guaranteeing the sufficient safe operation time in wellbore. However, for lack of dynamic mathematical model analysis methods for reflecting the changes of annulus liquid level in the borehole during the “Hang's Mudding-off” operation, the actual operation is basically conducted blindly without reasonable engineering basis. According to the actual conditions, a mathematical model for the safe time of the “Hang's Mudding-off” was, for the first time, built up by using the dynamic borehole leakage analysis method. Then, the integral results of leak-off rates were calculated. Finally, the calculation results were verified by field cases. It is shown that the calculation results are highly accordant with the actual data, indicating the reliability of the mathematical model. The safe operation time can be increased by increasing mud amount or reducing mud density appropriately. With this model, the safe time of “Hang's Mudding-off” operation can be calculated accurately. This research result is of great significance to avoiding well control risk of absorption wells, optimizing the “Hang's Mudding-off” technique and reducing project cost.
topic Pressure control
Circulation loss of returns
“Hang's Mudding-off” technique
Liquid level monitoring
Mathematical model
Dynamic pressure balance
Safe time
Leak-off rate
url http://www.sciencedirect.com/science/article/pii/S2352854017300153
work_keys_str_mv AT huixinliu safetytimecalculationmethodforhangsmuddingoffoperationundercirculationlossofreturns
AT dongchangfan safetytimecalculationmethodforhangsmuddingoffoperationundercirculationlossofreturns
AT puliu safetytimecalculationmethodforhangsmuddingoffoperationundercirculationlossofreturns
_version_ 1724168339047055360