Accuracy of Location Currency and Processing of Received Data on International Transport Corridors and High-Speed Masters
The main stages of geodetic survey of the railway are considered, both in the new construction and in the reconstruction of existing sites. The analysis of the line plan on curves and direct sections of the railways of Ukrainian international transport corridors is given. Calculations are made on th...
Main Authors: | V. Pogrebnyak, A. Shevchenko, A. Matvienko |
---|---|
Format: | Article |
Language: | English |
Published: |
LLC Production and Commercial Company «FAVOR, LTD»
2019-03-01
|
Series: | Метрологія та прилади |
Subjects: | |
Online Access: | https://mmi-journal.org/index.php/journal/article/view/85 |
Similar Items
-
Problems of Accuracy of Measurements of Curves on International Transport Corridors of Ukraine
by: A. Matvienko, et al.
Published: (2018-08-01) -
Freight corridor performance measurement system: A framework for South Africa
by: Jan H. Havenga, et al.
Published: (2016-11-01) -
LINEAR POSITIONING OF RAILWAY OBJECTS
by: Maciej IRLIK
Published: (2017-09-01) -
Environmental analysis in the zone of Corridor X in Serbia
by: Miljanović Dragana N., et al.
Published: (2004-01-01) -
Localization of Increased Noise at Operating Speed of a Passenger Wagon
by: Ján Ďungel, et al.
Published: (2021-01-01)