DYNAMIC INFLUENCE CAUSED BY CLOSE BLASTING ON PRIMARY AND SECONDARY SUPPORT SYSTEM IN TUNNEL "SV. ROK"

At the construction site of the road tunnel Sv. Rok, the second, left tunnels tube is being constructed parallel to the unfinished right tunnel. The part of right tunnel tube is supported with primary support system according to NAMT, the second part is supported complete with concrete. Distance bet...

Full description

Bibliographic Details
Main Authors: Zvonimir Ester, Mario Dobrilović, Darko Vrkljan
Format: Article
Language:English
Published: Faculty of Mining, Geology and Petroleum Engineering 2003-12-01
Series:Rudarsko-geološko-naftni Zbornik
Subjects:
Online Access:http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=20518&lang=en
id doaj-502bbc5fe4ae4c5c9373dd6b605ae2ed
record_format Article
spelling doaj-502bbc5fe4ae4c5c9373dd6b605ae2ed2020-11-24T21:25:10ZengFaculty of Mining, Geology and Petroleum EngineeringRudarsko-geološko-naftni Zbornik0353-45291849-04092003-12-011515762DYNAMIC INFLUENCE CAUSED BY CLOSE BLASTING ON PRIMARY AND SECONDARY SUPPORT SYSTEM IN TUNNEL "SV. ROK"Zvonimir Ester 0Mario Dobrilović 1Darko Vrkljan2Faculty of Mining, Geology and Petroleum Engineering, University of Zagreb, Pierottijeva 6, Zagreb, CroatiaFaculty of Mining, Geology and Petroleum Engineering, University of Zagreb, Pierottijeva 6, Zagreb, CroatiaFaculty of Mining, Geology and Petroleum Engineering, University of Zagreb, Pierottijeva 6, Zagreb, CroatiaAt the construction site of the road tunnel Sv. Rok, the second, left tunnels tube is being constructed parallel to the unfinished right tunnel. The part of right tunnel tube is supported with primary support system according to NAMT, the second part is supported complete with concrete. Distance between axes of the tunnel tubes is approximately 35 m. Drifting of the left tube is being done by blasting. A potential problem of damaging the surrounding rock and support system was recognized. It is well known that the ground vibration particle velocity due to a blast is a measure of damage on the nearby construction. The three component seismographs were used to measure ground oscillation velocities in the right tunnel tube. Total of 30 measurements were executed and 720 values were processed (including all three component oscillation velocities). Maximum ground oscillation velocity recorded was 232.061 mm/s. This paper brings conclusion derived from monitoring data achieved at close proximity to the blasting area, damage level criteria for the rock mass and support system and discusses how these results could assist further development in the control of blasting technique.http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=20518&lang=entunnelblastingseismic effectsprimary and secondary tunnel support system
collection DOAJ
language English
format Article
sources DOAJ
author Zvonimir Ester
Mario Dobrilović
Darko Vrkljan
spellingShingle Zvonimir Ester
Mario Dobrilović
Darko Vrkljan
DYNAMIC INFLUENCE CAUSED BY CLOSE BLASTING ON PRIMARY AND SECONDARY SUPPORT SYSTEM IN TUNNEL "SV. ROK"
Rudarsko-geološko-naftni Zbornik
tunnel
blasting
seismic effects
primary and secondary tunnel support system
author_facet Zvonimir Ester
Mario Dobrilović
Darko Vrkljan
author_sort Zvonimir Ester
title DYNAMIC INFLUENCE CAUSED BY CLOSE BLASTING ON PRIMARY AND SECONDARY SUPPORT SYSTEM IN TUNNEL "SV. ROK"
title_short DYNAMIC INFLUENCE CAUSED BY CLOSE BLASTING ON PRIMARY AND SECONDARY SUPPORT SYSTEM IN TUNNEL "SV. ROK"
title_full DYNAMIC INFLUENCE CAUSED BY CLOSE BLASTING ON PRIMARY AND SECONDARY SUPPORT SYSTEM IN TUNNEL "SV. ROK"
title_fullStr DYNAMIC INFLUENCE CAUSED BY CLOSE BLASTING ON PRIMARY AND SECONDARY SUPPORT SYSTEM IN TUNNEL "SV. ROK"
title_full_unstemmed DYNAMIC INFLUENCE CAUSED BY CLOSE BLASTING ON PRIMARY AND SECONDARY SUPPORT SYSTEM IN TUNNEL "SV. ROK"
title_sort dynamic influence caused by close blasting on primary and secondary support system in tunnel "sv. rok"
publisher Faculty of Mining, Geology and Petroleum Engineering
series Rudarsko-geološko-naftni Zbornik
issn 0353-4529
1849-0409
publishDate 2003-12-01
description At the construction site of the road tunnel Sv. Rok, the second, left tunnels tube is being constructed parallel to the unfinished right tunnel. The part of right tunnel tube is supported with primary support system according to NAMT, the second part is supported complete with concrete. Distance between axes of the tunnel tubes is approximately 35 m. Drifting of the left tube is being done by blasting. A potential problem of damaging the surrounding rock and support system was recognized. It is well known that the ground vibration particle velocity due to a blast is a measure of damage on the nearby construction. The three component seismographs were used to measure ground oscillation velocities in the right tunnel tube. Total of 30 measurements were executed and 720 values were processed (including all three component oscillation velocities). Maximum ground oscillation velocity recorded was 232.061 mm/s. This paper brings conclusion derived from monitoring data achieved at close proximity to the blasting area, damage level criteria for the rock mass and support system and discusses how these results could assist further development in the control of blasting technique.
topic tunnel
blasting
seismic effects
primary and secondary tunnel support system
url http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=20518&lang=en
work_keys_str_mv AT zvonimirester dynamicinfluencecausedbycloseblastingonprimaryandsecondarysupportsystemintunnelsvrok
AT mariodobrilovic dynamicinfluencecausedbycloseblastingonprimaryandsecondarysupportsystemintunnelsvrok
AT darkovrkljan dynamicinfluencecausedbycloseblastingonprimaryandsecondarysupportsystemintunnelsvrok
_version_ 1725984339621052416