The operational flight and multi-crew scheduling problem
This paper introduces a new kind of operational multi-crew scheduling problem which consists in simultaneously modifying, as necessary, the existing flight departure times and planned individual work days (duties) for the set of crew members, while respecting predefined aircraft itineraries. The spl...
Main Authors: | Stojković Mirela, Soumis François |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Belgrade
2005-01-01
|
Series: | Yugoslav Journal of Operations Research |
Subjects: | |
Online Access: | http://www.doiserbia.nb.rs/img/doi/0354-0243/2005/0354-02430501025S.pdf |
Similar Items
-
Cockpit Crew Pairing Problem in Airline Scheduling: Shortest Path with Resources Constraints Approach
by: Mohammad Reisi, et al.
Published: (2013-12-01) -
Topics in airline crew scheduling and large scale optimization
by: Klabjan, Diego
Published: (2009) -
Airline crew scheduling under uncertainty
by: Schaefer, Andrew James
Published: (2008) -
Multiobjective Evolutionary Scheduling and Rescheduling of Integrated Aircraft Routing and Crew Pairing Problems
by: Chiu-Hung Chen, et al.
Published: (2020-01-01) -
An integrated mathematical model for aircraft routing and crew scheduling for airlines with multi fleet and multi maintenance hub
by: Alireza Rashidi Komijan, et al.
Published: (2020-01-01)