Analysis of the Effects of Process Parameters on Start-Up Operation in Continuous Wet Granulation
Toward further implementation of continuous tablet manufacturing, one key issue is the time needed for start-up operation because it could lead to lower product yield and reduced economic performance. The behavior of the start-up operation is not well understood; moreover, the definition of the star...
Main Authors: | Kensaku Matsunami, Alexander Ryckaert, Michiel Peeters, Sara Badr, Hirokazu Sugiyama, Ingmar Nopens, Thomas De Beer |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-08-01
|
Series: | Processes |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-9717/9/9/1502 |
Similar Items
-
Improvement of a 1D Population Balance Model for Twin-Screw Wet Granulation by Using Identifiability Analysis
by: Ana Alejandra Barrera Jiménez, et al.
Published: (2021-05-01) -
Identifying Critical Binder Attributes to Facilitate Binder Selection for Efficient Formulation Development in a Continuous Twin Screw Wet Granulation Process
by: Lise Vandevivere, et al.
Published: (2021-02-01) -
Particle-Scale Modeling to Understand Liquid Distribution in Twin-Screw Wet Granulation
by: Ashish Kumar, et al.
Published: (2021-06-01) -
Comparison of two granulation processes with the view to reduce manufacturing cost
by: Maclean, Aldritt Allister
Published: (2004) -
Selection of disintegrants for wet granulation method of “Angiolin” tablets
by: I. A. Mazur, et al.
Published: (2016-10-01)