Influence of Water Inrush from Excavation Surface on the Stress and Deformation of Tunnel-Forming Structure at the Launching-Arrival Stage of Subway Shield
The launching-arrival stage of the shield is the most dangerous construction stage in subway construction. During the conversion process of the soil and air medium in the shield machine, water inrush at the excavation surface often occurs because of the effect of groundwater. Previous research has f...
Main Authors: | Shusheng Lv, Wen Liu, Shihong Zhai, Peishuai Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2019-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/6989730 |
Similar Items
-
Effects of Water Inrush from Tunnel Excavation Face on the Deformation and Mechanical Performance of Shield Tunnel Segment Joints
by: Tingsheng Zhao, et al.
Published: (2017-01-01) -
Analysis of Ground Deformation Caused by Subway Tunnel Excavation in Kunming
by: Wei Ping, et al.
Published: (2021-01-01) -
Influence of Subway Shield Tunnel Construction on Ground Settlement
by: Zhang Yilei, et al.
Published: (2021-01-01) -
Research on Prevention and Control of Water Inrush from Tunnel Excavation- Taking Guanyin Tunnel as an Example
by: CHEN.KIN.FU, et al.
Published: (2018) -
Muck Problems in Subway Shield Tunneling in Sandy Cobble Stratum
by: Cui Kai, et al.
Published: (2016-10-01)