Executive Disadvantages in the Layered Wall of the Facade
In this paper a case of three-layer wall and fitting windows is described. The walls outside layer are made of clinker brick. The public basis is a situation, which occurred in an office building. In this building was a water stain on the windows inside the upstairs part the building, during the rai...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2016-09-01
|
Series: | Civil and Environmental Engineering Reports |
Subjects: | |
Online Access: | http://www.degruyter.com/view/j/ceer.2016.22.issue-3/ceer-2016-0034/ceer-2016-0034.xml?format=INT |
id |
doaj-4d7a025bde424c62a4166cf61bd29d12 |
---|---|
record_format |
Article |
spelling |
doaj-4d7a025bde424c62a4166cf61bd29d122020-11-25T01:03:31ZengSciendoCivil and Environmental Engineering Reports2450-85942016-09-01223556010.1515/ceer-2016-0034ceer-2016-0034Executive Disadvantages in the Layered Wall of the FacadeGrochowska Elżbieta0Matysiak Antoni1University of Zielona Gora, Faculty of Building, Architecture and Environmental Engineering, Z. Szafrana st 1, 65-516 Zielona Góra, tel.+48683282320, PolandUniversity of Zielona Gora, Faculty of Building, Architecture and Environmental Engineering, Z. Szafrana st 1, 65-516 Zielona Góra, tel.+48683283282251, PolandIn this paper a case of three-layer wall and fitting windows is described. The walls outside layer are made of clinker brick. The public basis is a situation, which occurred in an office building. In this building was a water stain on the windows inside the upstairs part the building, during the rain. In project of the building there were no details of performing three-layer wall and fitting of windows. In Poland one did not described in detail the realization for windows installation in three-layer wall.http://www.degruyter.com/view/j/ceer.2016.22.issue-3/ceer-2016-0034/ceer-2016-0034.xml?format=INThree-layer wallfit windowsdefect regulationsbuilding project |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Grochowska Elżbieta Matysiak Antoni |
spellingShingle |
Grochowska Elżbieta Matysiak Antoni Executive Disadvantages in the Layered Wall of the Facade Civil and Environmental Engineering Reports hree-layer wall fit windows defect regulations building project |
author_facet |
Grochowska Elżbieta Matysiak Antoni |
author_sort |
Grochowska Elżbieta |
title |
Executive Disadvantages in the Layered Wall of the Facade |
title_short |
Executive Disadvantages in the Layered Wall of the Facade |
title_full |
Executive Disadvantages in the Layered Wall of the Facade |
title_fullStr |
Executive Disadvantages in the Layered Wall of the Facade |
title_full_unstemmed |
Executive Disadvantages in the Layered Wall of the Facade |
title_sort |
executive disadvantages in the layered wall of the facade |
publisher |
Sciendo |
series |
Civil and Environmental Engineering Reports |
issn |
2450-8594 |
publishDate |
2016-09-01 |
description |
In this paper a case of three-layer wall and fitting windows is described. The walls outside layer are made of clinker brick. The public basis is a situation, which occurred in an office building. In this building was a water stain on the windows inside the upstairs part the building, during the rain. In project of the building there were no details of performing three-layer wall and fitting of windows. In Poland one did not described in detail the realization for windows installation in three-layer wall. |
topic |
hree-layer wall fit windows defect regulations building project |
url |
http://www.degruyter.com/view/j/ceer.2016.22.issue-3/ceer-2016-0034/ceer-2016-0034.xml?format=INT |
work_keys_str_mv |
AT grochowskaelzbieta executivedisadvantagesinthelayeredwallofthefacade AT matysiakantoni executivedisadvantagesinthelayeredwallofthefacade |
_version_ |
1725200874248077312 |