Flexible resource management and its effect on project cost and duration
Abstract In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinator...
Main Authors: | Denis C. Pinha, Rashpal S. Ahluwalia |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University
2018-06-01
|
Series: | Journal of Industrial Engineering International |
Subjects: | |
Online Access: | http://link.springer.com/article/10.1007/s40092-018-0277-3 |
Similar Items
-
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
by: Denis Pinha, et al.
Published: (2016-11-01) -
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
by: Denis Pinha, et al.
Published: (2016-11-01) -
Crashing Construction Project Schedules by Relocating Resources
by: Michal Tomczak, et al.
Published: (2020-01-01) -
Interval Estimate of Project Time Completion Using Simulation Approach
by: Amin Zeinalzadeh, et al.
Published: (2010-08-01) -
An Algorithm for Efficient Generation of Customized Priority Rules for Production Control in Project Manufacturing with Stochastic Job Processing Times
by: Mathias Kühn, et al.
Published: (2020-12-01)