METHODOLOGY FOR HYDRAULIC CALCULATION OF RIVER REGULATION AND DETERMINATION OF DIKE PARAMETERS

Territory protection against flood water inundation and creation of polder systems are carried out with the help of protection dikes. One of the main requirements to the composition of polder systems in flood plains is a location of border dikes beyond meander belt in order to avoid their erosion wh...

Full description

Bibliographic Details
Main Author: E. I. Mikhnevich
Format: Article
Language:Russian
Published: Belarusian National Technical University 2017-07-01
Series:Nauka i Tehnika
Subjects:
Online Access:https://sat.bntu.by/jour/article/view/1027
id doaj-4a9912c79b0945579c351be9f4577e99
record_format Article
spelling doaj-4a9912c79b0945579c351be9f4577e992021-07-29T08:29:35ZrusBelarusian National Technical UniversityNauka i Tehnika2227-10312414-03922017-07-0116429830310.21122/2227-1031-2017-16-4-298-303958METHODOLOGY FOR HYDRAULIC CALCULATION OF RIVER REGULATION AND DETERMINATION OF DIKE PARAMETERSE. I. Mikhnevich0Belаrusian National Technical UniversityTerritory protection against flood water inundation and creation of polder systems are carried out with the help of protection dikes. One of the main requirements to the composition of polder systems in flood plains is a location of border dikes beyond meander belt in order to avoid their erosion when meander development occurs. Meander belt width can be determined on the basis of the analysis of multi-year land surveying pertaining top river-bed building and in the case when such data is not available this parameter is calculated in accordance with the Snishchenko formula. While banking-up a river bed a flooded area is decreasing and, consequently, water level in inter-dike space and rate of flood water are significantly increasing. For this reason it is necessary to locate dikes at a such distance from a river bed which will not cause rather high increase in water level and flow velocity in the inter-dike space. Methodology for hydraulic calculation of river regulation has been developed in order to substantiate design parameters for levee systems, creation of favourable hydraulic regime in these systems and provision of sustainability for dikes. Its main elements are calculations of pass-through capacity of the leveed channel and rise of water level in inter-dike space, and distance between dikes and their crest level. Peculiar feature of the proposed calculated formulae is an interaction consideration of channel and inundated flows. Their mass-exchanging process results in slowing-down of the channel flow and acceleration of the inundated flow. This occurrence is taken into account and coefficients of kinematic efficiency are introduced to the elements of water flow rate in the river channel and flood plain, respectively. The adduced dependencies for determination of a dike crest level (consequently their height) take into consideration a rise of water level in inter-dike space for two types of polder systems: non-inundable (winter) dikes with maximum spring flood rate and inundable (summer) dikes with summer-autumn flood rates. The proposed calculated formulae can be recommended for application at design organizations.https://sat.bntu.by/jour/article/view/1027river regulationpolder systemdikeflow inter-actionwater levelhydraulic calculation
collection DOAJ
language Russian
format Article
sources DOAJ
author E. I. Mikhnevich
spellingShingle E. I. Mikhnevich
METHODOLOGY FOR HYDRAULIC CALCULATION OF RIVER REGULATION AND DETERMINATION OF DIKE PARAMETERS
Nauka i Tehnika
river regulation
polder system
dike
flow inter-action
water level
hydraulic calculation
author_facet E. I. Mikhnevich
author_sort E. I. Mikhnevich
title METHODOLOGY FOR HYDRAULIC CALCULATION OF RIVER REGULATION AND DETERMINATION OF DIKE PARAMETERS
title_short METHODOLOGY FOR HYDRAULIC CALCULATION OF RIVER REGULATION AND DETERMINATION OF DIKE PARAMETERS
title_full METHODOLOGY FOR HYDRAULIC CALCULATION OF RIVER REGULATION AND DETERMINATION OF DIKE PARAMETERS
title_fullStr METHODOLOGY FOR HYDRAULIC CALCULATION OF RIVER REGULATION AND DETERMINATION OF DIKE PARAMETERS
title_full_unstemmed METHODOLOGY FOR HYDRAULIC CALCULATION OF RIVER REGULATION AND DETERMINATION OF DIKE PARAMETERS
title_sort methodology for hydraulic calculation of river regulation and determination of dike parameters
publisher Belarusian National Technical University
series Nauka i Tehnika
issn 2227-1031
2414-0392
publishDate 2017-07-01
description Territory protection against flood water inundation and creation of polder systems are carried out with the help of protection dikes. One of the main requirements to the composition of polder systems in flood plains is a location of border dikes beyond meander belt in order to avoid their erosion when meander development occurs. Meander belt width can be determined on the basis of the analysis of multi-year land surveying pertaining top river-bed building and in the case when such data is not available this parameter is calculated in accordance with the Snishchenko formula. While banking-up a river bed a flooded area is decreasing and, consequently, water level in inter-dike space and rate of flood water are significantly increasing. For this reason it is necessary to locate dikes at a such distance from a river bed which will not cause rather high increase in water level and flow velocity in the inter-dike space. Methodology for hydraulic calculation of river regulation has been developed in order to substantiate design parameters for levee systems, creation of favourable hydraulic regime in these systems and provision of sustainability for dikes. Its main elements are calculations of pass-through capacity of the leveed channel and rise of water level in inter-dike space, and distance between dikes and their crest level. Peculiar feature of the proposed calculated formulae is an interaction consideration of channel and inundated flows. Their mass-exchanging process results in slowing-down of the channel flow and acceleration of the inundated flow. This occurrence is taken into account and coefficients of kinematic efficiency are introduced to the elements of water flow rate in the river channel and flood plain, respectively. The adduced dependencies for determination of a dike crest level (consequently their height) take into consideration a rise of water level in inter-dike space for two types of polder systems: non-inundable (winter) dikes with maximum spring flood rate and inundable (summer) dikes with summer-autumn flood rates. The proposed calculated formulae can be recommended for application at design organizations.
topic river regulation
polder system
dike
flow inter-action
water level
hydraulic calculation
url https://sat.bntu.by/jour/article/view/1027
work_keys_str_mv AT eimikhnevich methodologyforhydrauliccalculationofriverregulationanddeterminationofdikeparameters
_version_ 1721255400707194880