Cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built asset
In the following paper, we shortly present a research line, started to find methods to optimize design choices and actually focused on renovation strategies. The aim of the presented work is to propose a method for the assessment of different renovation options for existing buildings and the measure...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Ar.Tec.
2015-06-01
|
Series: | Tema |
Online Access: | http://artecweb.org/ojs2/index.php/TeMA/article/view/68 |
id |
doaj-49e987d1b5a241afb59c49247e905c21 |
---|---|
record_format |
Article |
spelling |
doaj-49e987d1b5a241afb59c49247e905c212020-11-25T01:18:31ZengAr.Tec.Tema2421-45742015-06-011211211710.17410/tema.v1i2.6868Cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built assetGiorgio Pansa0Enrico De Angelis1Politecnico di Milano, Dep. ABCPolitecnico di Milano, Dep. ABCIn the following paper, we shortly present a research line, started to find methods to optimize design choices and actually focused on renovation strategies. The aim of the presented work is to propose a method for the assessment of different renovation options for existing buildings and the measure of what is here called the “renovation potential” of a built asset, i.e. the maximum possible saving during a reference service life of a building, obtainable through a renovation, and the “cost-optimal renovation solution”, i.e the best (most sustainable) solution that reaches the renovation potential.http://artecweb.org/ojs2/index.php/TeMA/article/view/68 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Giorgio Pansa Enrico De Angelis |
spellingShingle |
Giorgio Pansa Enrico De Angelis Cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built asset Tema |
author_facet |
Giorgio Pansa Enrico De Angelis |
author_sort |
Giorgio Pansa |
title |
Cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built asset |
title_short |
Cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built asset |
title_full |
Cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built asset |
title_fullStr |
Cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built asset |
title_full_unstemmed |
Cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built asset |
title_sort |
cost-optimal analysis of building renovation strategies and the assesment of the “renovation potential” of a built asset |
publisher |
Ar.Tec. |
series |
Tema |
issn |
2421-4574 |
publishDate |
2015-06-01 |
description |
In the following paper, we shortly present a research line, started to find methods to optimize design choices and actually focused on renovation strategies. The aim of the presented work is to propose a method for the assessment of different renovation options for existing buildings and the measure of what is here called the “renovation potential” of a built asset, i.e. the maximum possible saving during a reference service life of a building, obtainable through a renovation, and the “cost-optimal renovation solution”, i.e the best (most sustainable) solution that reaches the renovation potential. |
url |
http://artecweb.org/ojs2/index.php/TeMA/article/view/68 |
work_keys_str_mv |
AT giorgiopansa costoptimalanalysisofbuildingrenovationstrategiesandtheassesmentoftherenovationpotentialofabuiltasset AT enricodeangelis costoptimalanalysisofbuildingrenovationstrategiesandtheassesmentoftherenovationpotentialofabuiltasset |
_version_ |
1725142105232244736 |