Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction Industry

It is the consensus of scholars that the productivity of the construction industry is very low when compared with other industries. Concurrent Engineering (CE), which has a primary goal of reducing the total time from designing a product to releasing it into the market, while creating better designs...

Full description

Bibliographic Details
Main Authors: Nathaniel Anny Aniekwu, Anthony C. Igboanugo
Format: Article
Language:English
Published: SAGE Publishing 2012-12-01
Series:International Journal of Engineering Business Management
Online Access:https://doi.org/10.5772/51607
id doaj-49a498b7d0d6461d827be31932ffcd9b
record_format Article
spelling doaj-49a498b7d0d6461d827be31932ffcd9b2021-04-02T13:36:49ZengSAGE PublishingInternational Journal of Engineering Business Management1847-97902012-12-01410.5772/5160741570Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction IndustryNathaniel Anny Aniekwu0Anthony C. Igboanugo1 Civil Engineering Department, University of Benin, Benin City, Nigeria Production Engineering Department, University of Benin, Benin City, NigeriaIt is the consensus of scholars that the productivity of the construction industry is very low when compared with other industries. Concurrent Engineering (CE), which has a primary goal of reducing the total time from designing a product to releasing it into the market, while creating better designs as well, has been identified as one of the concepts that has yielded effective adaptation in the construction industry. An exploratory survey was used to identify 63 variables with the capacity to influence the uptake of Concurrent Engineering in Nigeria and was used to design a questionnaire, which was distributed to 50 stratified construction industry stakeholders. A statistical software package (STATISTI-XL) was used to analyse the severity index of each variable, in order to establish the importance of each variable in influencing the uptake of Concurrent engineering and also to compute the Kendall's coefficient of concordance, which assess the levels of agreement among the judges on the consistency of the rankings. A Kendall's coefficient of concordance of W=0.57365 was recorded. A lack of awareness emerged as the most important barrier against the integration of this concept into the Nigerian construction industry. The top five variables are all human factors that can be ameliorated by proper education.https://doi.org/10.5772/51607
collection DOAJ
language English
format Article
sources DOAJ
author Nathaniel Anny Aniekwu
Anthony C. Igboanugo
spellingShingle Nathaniel Anny Aniekwu
Anthony C. Igboanugo
Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction Industry
International Journal of Engineering Business Management
author_facet Nathaniel Anny Aniekwu
Anthony C. Igboanugo
author_sort Nathaniel Anny Aniekwu
title Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction Industry
title_short Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction Industry
title_full Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction Industry
title_fullStr Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction Industry
title_full_unstemmed Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction Industry
title_sort barriers to the uptake of concurrent engineering in the nigerian construction industry
publisher SAGE Publishing
series International Journal of Engineering Business Management
issn 1847-9790
publishDate 2012-12-01
description It is the consensus of scholars that the productivity of the construction industry is very low when compared with other industries. Concurrent Engineering (CE), which has a primary goal of reducing the total time from designing a product to releasing it into the market, while creating better designs as well, has been identified as one of the concepts that has yielded effective adaptation in the construction industry. An exploratory survey was used to identify 63 variables with the capacity to influence the uptake of Concurrent Engineering in Nigeria and was used to design a questionnaire, which was distributed to 50 stratified construction industry stakeholders. A statistical software package (STATISTI-XL) was used to analyse the severity index of each variable, in order to establish the importance of each variable in influencing the uptake of Concurrent engineering and also to compute the Kendall's coefficient of concordance, which assess the levels of agreement among the judges on the consistency of the rankings. A Kendall's coefficient of concordance of W=0.57365 was recorded. A lack of awareness emerged as the most important barrier against the integration of this concept into the Nigerian construction industry. The top five variables are all human factors that can be ameliorated by proper education.
url https://doi.org/10.5772/51607
work_keys_str_mv AT nathanielannyaniekwu barrierstotheuptakeofconcurrentengineeringinthenigerianconstructionindustry
AT anthonycigboanugo barrierstotheuptakeofconcurrentengineeringinthenigerianconstructionindustry
_version_ 1721564361340747776