Understanding the Environmental Study Life Cycle in the United States Hydropower Licensing and Federal Authorization Process
We analyzed United States Federal Energy Regulatory Commission (FERC) documents prepared for 29 recently licensed hydropower projects and created two novel datasets to improve understanding of the environmental study life cycle, defined here as the process that begins with an environmental study bei...
Main Authors: | Matthew S. P. Aldrovandi, Esther S. Parish, Brenda M. Pracheil |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-06-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/14/12/3435 |
Similar Items
-
Transboundary hydropower in contested contexts: Energy security, capabilities, and justice in comparative perspective
by: Cecilia Llamosas, et al.
Published: (2021-09-01) -
The Regulatory Noose: Logan City’s Adventures in Micro-Hydropower
by: Megan Hansen, et al.
Published: (2016-06-01) -
A GIS based assessment of hydropower potential in Hornád basin
by: �ofia Kuzevičová, et al.
Published: (2013-12-01) -
Hydropower and its development
by: Janusz Steller
Published: (2013-09-01) -
Hydropower in Sweden : An investigation of the implications of adding detail to the modelling of hydropower in OSeMOSYS
by: Flood, Cecilia
Published: (2015)