Managing risks of precast concrete supply chain: a case study
Precast concrete has typically long lead time, starting from order placement, production stage, to delivery to project site, all of which requires good supply chain management. As a consequence, the risks of its supply chains are inevitable and must be anticipated to ensure the success of a project....
Main Authors: | Utomo Dwi Hatmoko Jati, Agung Wibowo Mochamad, Dewi Astuty Marita, Ratna Arthaningtyas Desy, Nur Sholeh Moh |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_05004.pdf |
Similar Items
-
Supply Chain Performance Measurement at High Rise Building Construction Using SCOR Method Approach (Supply Chain Operations Reference)
by: Taufiq Fitrianto, et al.
Published: (2020-07-01) -
Supply Chain Performance Measurement Framework for Construction Materials: Micro Meso Macro
by: Moh Nur Sholeh, et al.
Published: (2020-11-01) -
The impact of supply chain management practice on construction project performance
by: Hatmoko, Jati Utmoto Dwi
Published: (2008) -
Investigating Building Information Modelling (BIM) Adoption in Indonesia Construction Industry
by: Hatmoko Jati Utomo Dwi, et al.
Published: (2019-01-01) -
Disruptions Control on Precast Concrete Supply Chain in Construction Projects
by: Iveline Anne Marie, et al.
Published: (2020-12-01)