Reaching the summit of discharge summaries: a quality improvement project

Background Discharge summaries need to be completed in a timely manner, to improve communication between primary and secondary care, and evidence suggests that delays in discharge summary completion can lead to patient harm.Following a hospital health and safety review due to the sheer backlog of no...

Full description

Bibliographic Details
Main Authors: Pramodh Vallabhaneni, Richard Thomas Richmond, Isobel Joy McFadzean
Format: Article
Language:English
Published: BMJ Publishing Group 2021-03-01
Series:BMJ Open Quality
Online Access:https://bmjopenquality.bmj.com/content/10/1/e001142.full
id doaj-46b7bffe60f34a24bedea473d3a5c20b
record_format Article
spelling doaj-46b7bffe60f34a24bedea473d3a5c20b2021-04-22T10:00:38ZengBMJ Publishing GroupBMJ Open Quality2399-66412021-03-0110110.1136/bmjoq-2020-001142Reaching the summit of discharge summaries: a quality improvement projectPramodh Vallabhaneni0Richard Thomas Richmond1Isobel Joy McFadzean2Department of Paediatrics, Morriston Hospital., Swansea, UKPaediatrics, Swansea Bay University Health Board, Port Talbot, UKSwansea Bay University Health Board, Port Talbot, UKBackground Discharge summaries need to be completed in a timely manner, to improve communication between primary and secondary care, and evidence suggests that delays in discharge summary completion can lead to patient harm.Following a hospital health and safety review due to the sheer backlog of notes in the doctor’s room and wards, urgent action had to be undertaken to improve the discharge summary completion process at our hospital’s paediatric assessment unit. It was felt that the process would best be carried out within a quality improvement (QI) project.Methods Kotter’s ‘eight-step model for change’ was implemented in this QI project with the aim to clear the existing backlog of pending discharge summaries and improve the timeliness of discharge summary completion from the hospital’s paediatric assessment unit. A minimum target of 10% improvement in the completion rate of discharge summaries was set as the primary goal of the project.Results Following the implementation of the QI processes, we were able to clear the backlog of discharge summaries within 9 months. We improved completion within 24 hours, from <10% to 84%, within 2 months. The success of our project lies in the sustainability of the change process; to date we have consistently achieved the target completion rates since the inception of the project. As a result of the project, we were able to modify the junior doctor rota to remove discharge summary duty slots and bolster workforce on the shop floor. This is still evident in November 2020, with consistently improved discharge summary rates.Conclusion QI projects when conducted successfully can be used to improve patient care, as well as reduce administrative burden on junior doctors. Our QI project is an example of how Kotter’s eight-step model for change can be applied to clinical practice.https://bmjopenquality.bmj.com/content/10/1/e001142.full
collection DOAJ
language English
format Article
sources DOAJ
author Pramodh Vallabhaneni
Richard Thomas Richmond
Isobel Joy McFadzean
spellingShingle Pramodh Vallabhaneni
Richard Thomas Richmond
Isobel Joy McFadzean
Reaching the summit of discharge summaries: a quality improvement project
BMJ Open Quality
author_facet Pramodh Vallabhaneni
Richard Thomas Richmond
Isobel Joy McFadzean
author_sort Pramodh Vallabhaneni
title Reaching the summit of discharge summaries: a quality improvement project
title_short Reaching the summit of discharge summaries: a quality improvement project
title_full Reaching the summit of discharge summaries: a quality improvement project
title_fullStr Reaching the summit of discharge summaries: a quality improvement project
title_full_unstemmed Reaching the summit of discharge summaries: a quality improvement project
title_sort reaching the summit of discharge summaries: a quality improvement project
publisher BMJ Publishing Group
series BMJ Open Quality
issn 2399-6641
publishDate 2021-03-01
description Background Discharge summaries need to be completed in a timely manner, to improve communication between primary and secondary care, and evidence suggests that delays in discharge summary completion can lead to patient harm.Following a hospital health and safety review due to the sheer backlog of notes in the doctor’s room and wards, urgent action had to be undertaken to improve the discharge summary completion process at our hospital’s paediatric assessment unit. It was felt that the process would best be carried out within a quality improvement (QI) project.Methods Kotter’s ‘eight-step model for change’ was implemented in this QI project with the aim to clear the existing backlog of pending discharge summaries and improve the timeliness of discharge summary completion from the hospital’s paediatric assessment unit. A minimum target of 10% improvement in the completion rate of discharge summaries was set as the primary goal of the project.Results Following the implementation of the QI processes, we were able to clear the backlog of discharge summaries within 9 months. We improved completion within 24 hours, from <10% to 84%, within 2 months. The success of our project lies in the sustainability of the change process; to date we have consistently achieved the target completion rates since the inception of the project. As a result of the project, we were able to modify the junior doctor rota to remove discharge summary duty slots and bolster workforce on the shop floor. This is still evident in November 2020, with consistently improved discharge summary rates.Conclusion QI projects when conducted successfully can be used to improve patient care, as well as reduce administrative burden on junior doctors. Our QI project is an example of how Kotter’s eight-step model for change can be applied to clinical practice.
url https://bmjopenquality.bmj.com/content/10/1/e001142.full
work_keys_str_mv AT pramodhvallabhaneni reachingthesummitofdischargesummariesaqualityimprovementproject
AT richardthomasrichmond reachingthesummitofdischargesummariesaqualityimprovementproject
AT isobeljoymcfadzean reachingthesummitofdischargesummariesaqualityimprovementproject
_version_ 1721514660892508160