An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem
This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled...
Main Authors: | Amir Hossein Hosseinian, Vahid Baradaran |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University, Qazvin Branch
2019-07-01
|
Series: | Journal of Optimization in Industrial Engineering |
Subjects: | |
Online Access: | http://www.qjie.ir/article_545828_2f3d2c0f3d95c91b2dd2ec503e7edddf.pdf |
Similar Items
-
Solving a new multi-objective resource constrained project scheduling problem by SAICA and compare it with DE method
by: A. Esmaili Dooki, et al.
Published: (2018-09-01) -
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
by: André Schnabel, et al.
Published: (2018-05-01) -
Relevance and Applicability of Multi-objective Resource Constrained Project Scheduling Problem: Review Article
by: V. Oladokun, et al.
Published: (2011-12-01) -
Human Resource Scheduling Model and Algorithm with Time Windows and Multi-Skill Constraints
by: Zhiping Zuo, et al.
Published: (2019-07-01) -
A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP)
by: Edgar Gutiérrez Franco, et al.
Published: (2008-01-01)