Numerical Model of Dephosphorization Reaction Kinetics in Top Blown Converter Coupled with Flow Field
A 3D transient numerical model of dephosphorization kinetics coupled with flow field in a top blown converter was built. Through the model the dephosphorization reaction rate influenced by the oxygen jets and the steel flow were simulated. The results show that the dephosphorization rate at the drop...
Main Authors: | Liu Wei, Yang Shufeng, Li Jingshe, Wang Minghui |
---|---|
Format: | Article |
Language: | English |
Published: |
De Gruyter
2017-07-01
|
Series: | High Temperature Materials and Processes |
Subjects: | |
Online Access: | https://doi.org/10.1515/htmp-2015-0184 |
Similar Items
-
Dephosphorization mechanism and phase change in the reduction of converter slag
by: Xue Yuekai, et al.
Published: (2021-07-01) -
Dephosphorization by Double-Slag Process in Converter Steelmaking
by: Wang Yang, et al.
Published: (2018-07-01) -
Dephosphorization in Double Slag Converter Steelmaking Process at Different Temperatures by Industrial Experiments
by: Han Sun, et al.
Published: (2021-06-01) -
Fundamental Experimental and Numerical Investigation Focusing on the Initial Stage of a Top-Blown Converter Process
by: Ersson, Mikael
Published: (2008) -
The investigation on the middle period dephosphorization in 70t converter
by: Nanyang Deng, et al.
Published: (2020-11-01)