Evaluation of installation efforts in metal coatings, allowing for assembly process

This article gives an account and analysis of the accuracy of assembly variations in the parameters of the stress-strain state - according to values of assembly (initial) efforts. Deviations are determined by the position of nodes and rods in space relative to their design values. The article consid...

Full description

Bibliographic Details
Main Authors: A.B. Bondarev, A. Yugov
Format: Article
Language:English
Published: Peter the Great St. Petersburg Polytechnic University 2015-06-01
Series:Инженерно-строительный журнал
Subjects:
Online Access:http://www.engstroy.spb.ru/eng/index_2015_04/04.html
id doaj-455349d524e74518b113e4baa7ceb5bb
record_format Article
spelling doaj-455349d524e74518b113e4baa7ceb5bb2020-11-25T01:50:23ZengPeter the Great St. Petersburg Polytechnic UniversityИнженерно-строительный журнал2071-47262071-03052015-06-0156283710.5862/MCE.56.4Evaluation of installation efforts in metal coatings, allowing for assembly processA.B. BondarevA. YugovThis article gives an account and analysis of the accuracy of assembly variations in the parameters of the stress-strain state - according to values of assembly (initial) efforts. Deviations are determined by the position of nodes and rods in space relative to their design values. The article considers two technological schemes of the dome cover assembly - from the edge to the center and from the center to the edge. . The accuracy calculation was made with the author's developed computing system "Dimensional analysis of rod structures" . Parameters of the stress-strain state of the dome cover, allowing for the accumulation of assembly deviations, were estimated using the computer complex SCAD. The results of the calculation effort in the shell, taking into account possible assembly deviations, are presented in the form of histograms; and deviations in the nodes and rods are presented in a tabular form. The data on the assembly effort and the deviations are given for individual items. The author suggests constructive solutions for joining rods and installation method for coatings, which are aimed at increasing their load-bearing capacity, longevity and assemblability.http://www.engstroy.spb.ru/eng/index_2015_04/04.htmllarge-span spatial shellshinged frame structuresinstallation effectsassembly deviation
collection DOAJ
language English
format Article
sources DOAJ
author A.B. Bondarev
A. Yugov
spellingShingle A.B. Bondarev
A. Yugov
Evaluation of installation efforts in metal coatings, allowing for assembly process
Инженерно-строительный журнал
large-span spatial shells
hinged frame structures
installation effects
assembly deviation
author_facet A.B. Bondarev
A. Yugov
author_sort A.B. Bondarev
title Evaluation of installation efforts in metal coatings, allowing for assembly process
title_short Evaluation of installation efforts in metal coatings, allowing for assembly process
title_full Evaluation of installation efforts in metal coatings, allowing for assembly process
title_fullStr Evaluation of installation efforts in metal coatings, allowing for assembly process
title_full_unstemmed Evaluation of installation efforts in metal coatings, allowing for assembly process
title_sort evaluation of installation efforts in metal coatings, allowing for assembly process
publisher Peter the Great St. Petersburg Polytechnic University
series Инженерно-строительный журнал
issn 2071-4726
2071-0305
publishDate 2015-06-01
description This article gives an account and analysis of the accuracy of assembly variations in the parameters of the stress-strain state - according to values of assembly (initial) efforts. Deviations are determined by the position of nodes and rods in space relative to their design values. The article considers two technological schemes of the dome cover assembly - from the edge to the center and from the center to the edge. . The accuracy calculation was made with the author's developed computing system "Dimensional analysis of rod structures" . Parameters of the stress-strain state of the dome cover, allowing for the accumulation of assembly deviations, were estimated using the computer complex SCAD. The results of the calculation effort in the shell, taking into account possible assembly deviations, are presented in the form of histograms; and deviations in the nodes and rods are presented in a tabular form. The data on the assembly effort and the deviations are given for individual items. The author suggests constructive solutions for joining rods and installation method for coatings, which are aimed at increasing their load-bearing capacity, longevity and assemblability.
topic large-span spatial shells
hinged frame structures
installation effects
assembly deviation
url http://www.engstroy.spb.ru/eng/index_2015_04/04.html
work_keys_str_mv AT abbondarev evaluationofinstallationeffortsinmetalcoatingsallowingforassemblyprocess
AT ayugov evaluationofinstallationeffortsinmetalcoatingsallowingforassemblyprocess
_version_ 1725002279933706240