Timetable Coordination of the First Trains for Subway Network With Maximum Passenger Perceived Transfer Quality
Non-coordinated first-train timetables can result in unfavorable train connections among different subway lines at transfer stations and generate rather long waiting time for transfer passengers. This paper aims at optimizing the first train originating times of different transit lines at the networ...
Main Authors: | Xuan Li, Lili Lu, Pengjun Zheng, Zhengfeng Huang |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2019-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8675919/ |
Similar Items
-
First Train Timetabling for Urban Rail Transit Networks with Maximum Passenger Transfer Satisfaction
by: Xuan Li, et al.
Published: (2020-05-01) -
Timetable synchronization for mass transit.
Published: (2004) -
Coordination between Subway and Urban Space: A Networked Approach
by: Lei Mao, et al.
Published: (2014-05-01) -
What Makes Urban Transportation Efficient? Evidence from Subway Transfer Stations in Korea
by: Changhee Kim, et al.
Published: (2017-11-01) -
Evaluation of The Passenger Areas of Underground Subway Stations In Terms of Visual Comfort: The Sample of Kadıköy and Kartal Stations
by: Didem Aktop Maden, et al.
Published: (2017-04-01)