Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm
This research proposes a systematic model by using bee algorithm to optimize ready mixed concrete truck scheduling problem from a single plant to multiple sized receivers in a large search space using uncertain factors of bee algorithm compared to genetic algorithm. The objective is to minimize th...
Main Authors: | Nuntana Mayteekrieangkrai, Wuthichai Wongthatsanekorn |
---|---|
Format: | Article |
Language: | English |
Published: |
Prince of Songkla University
2015-04-01
|
Series: | Songklanakarin Journal of Science and Technology (SJST) |
Subjects: | |
Online Access: | http://rdo.psu.ac.th/sjstweb/journal/37-2/37-2-13.pdf |
Similar Items
-
A comparison of genetic algorithm and artificial bee colony approaches in solving blocking hybrid flowshop scheduling problem with sequence dependent setup/changeover times
by: Pongpan Nakkaew, et al.
Published: (2016-06-01) -
Dispatching concrete trucks using simulation method
by: Sławomir Biruk
Published: (2015-06-01) -
A Comprehensive Evaluation of Weak and Strong Mutation Mechanisms in Evolutionary Algorithms for Truck Scheduling at Cross-Docking Terminals
by: Maxim A. Dulebenets
Published: (2018-01-01) -
Parameters Estimation of Uncertain Fractional-Order Chaotic Systems via a Modified Artificial Bee Colony Algorithm
by: Wei Hu, et al.
Published: (2015-02-01) -
Time-Based Dance Scheduling for Artificial Bee Colony Algorithm and Its Variants
by: Selcuk Aslan
Published: (2019-01-01)