Optimal Scheduling of Material Handling Devices in a PCB Production Line: Problem Formulation and a Polynomial Algorithm
Main Authors: | Ada Che, Chengbin Chu |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2008-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2008/364279 |
Similar Items
-
Gentic algorithms for PCB factory scheduling problems
by: wu ping wei, et al.
Published: (2005) -
Solving the Component Scheduling Problem in PCB Assembly with Hybrid Genetic Algorithm
by: Hsin-Hui Lin, et al.
Published: (2005) -
Approximation Algorithms for Multitasking Scheduling Problems
by: Feifeng Zheng, et al.
Published: (2020-01-01) -
A tabu search algorithm for the unrelated parallel machines scheduling problem of drilling operations in PCB factoty
by: Lich-Chao Hsu, et al.
Published: (2001) -
Development Intelligent Genetic Algorithms for Multi-Objective Scheduling—An Example of Drilling Operation Problems in PCB Factory
by: Chih-Yuan Wang, et al.
Published: (2004)