CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERS

Although some countries have presented positive results from strategies to reduce construction and demolition (CDW) waste generation and/or increase recycling, many have high generation rates and low recycling rates, like Brazil. This paper presents results of two case studies, involving CDW recycli...

Full description

Bibliographic Details
Main Authors: Andrea Parisi Kern, Joana Michelon Moresco, Eduardo Pizoni, Marco Aurélio Stumpf González
Format: Article
Language:English
Published: Universidade Federal de Santa Catarina (UFSC) 2021-04-01
Series:Mix Sustentável
Subjects:
Online Access:https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4215
id doaj-40d0298d35374ed08e7522a84740836a
record_format Article
spelling doaj-40d0298d35374ed08e7522a84740836a2021-08-20T21:42:49ZengUniversidade Federal de Santa Catarina (UFSC)Mix Sustentável2447-08992447-30732021-04-0172799210.29183/2447-3073.MIX2021.v7.n2.79-922787CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERSAndrea Parisi Kern0Joana Michelon Moresco1Eduardo Pizoni2Marco Aurélio Stumpf González3Universidade do Vale do Rio dos Sinos - UNISINOSUNISINOSUNISINOSUNSIINOSAlthough some countries have presented positive results from strategies to reduce construction and demolition (CDW) waste generation and/or increase recycling, many have high generation rates and low recycling rates, like Brazil. This paper presents results of two case studies, involving CDW recycling plants: a) with external sale of recycled aggregate (RA); and b) without external sale of RA, with the objective to analyze financial results, the main influence factors and the role of different players in the viability of CDW recycling. Results show the essential role that must be played by the Public Power in terms of waste flow guarantee: the arrival of the waste in the recycling plants and the consumer market for the recycled product. However, while landfill disposal and natural aggregate are available at a relatively low cost,the flow guarantee is a challenge. Both cases showed a positive financial result, considering the first years of operation. In the first, results showed advantages in the 75t/h plant compared to the 50t/h plant. In the second, the amount of the recycled aggregate consumed is a key factor in order to optimize the costs related to the implementation and operation of the construction waste recycle plant.https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4215: resíduo de construção e demolição (rcd)planta de reciclagem de rcdagregado reciclado.
collection DOAJ
language English
format Article
sources DOAJ
author Andrea Parisi Kern
Joana Michelon Moresco
Eduardo Pizoni
Marco Aurélio Stumpf González
spellingShingle Andrea Parisi Kern
Joana Michelon Moresco
Eduardo Pizoni
Marco Aurélio Stumpf González
CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERS
Mix Sustentável
: resíduo de construção e demolição (rcd)
planta de reciclagem de rcd
agregado reciclado.
author_facet Andrea Parisi Kern
Joana Michelon Moresco
Eduardo Pizoni
Marco Aurélio Stumpf González
author_sort Andrea Parisi Kern
title CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERS
title_short CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERS
title_full CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERS
title_fullStr CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERS
title_full_unstemmed CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERS
title_sort cdw recycling plants: financial analysis, influence factors and the role of main players
publisher Universidade Federal de Santa Catarina (UFSC)
series Mix Sustentável
issn 2447-0899
2447-3073
publishDate 2021-04-01
description Although some countries have presented positive results from strategies to reduce construction and demolition (CDW) waste generation and/or increase recycling, many have high generation rates and low recycling rates, like Brazil. This paper presents results of two case studies, involving CDW recycling plants: a) with external sale of recycled aggregate (RA); and b) without external sale of RA, with the objective to analyze financial results, the main influence factors and the role of different players in the viability of CDW recycling. Results show the essential role that must be played by the Public Power in terms of waste flow guarantee: the arrival of the waste in the recycling plants and the consumer market for the recycled product. However, while landfill disposal and natural aggregate are available at a relatively low cost,the flow guarantee is a challenge. Both cases showed a positive financial result, considering the first years of operation. In the first, results showed advantages in the 75t/h plant compared to the 50t/h plant. In the second, the amount of the recycled aggregate consumed is a key factor in order to optimize the costs related to the implementation and operation of the construction waste recycle plant.
topic : resíduo de construção e demolição (rcd)
planta de reciclagem de rcd
agregado reciclado.
url https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4215
work_keys_str_mv AT andreaparisikern cdwrecyclingplantsfinancialanalysisinfluencefactorsandtheroleofmainplayers
AT joanamichelonmoresco cdwrecyclingplantsfinancialanalysisinfluencefactorsandtheroleofmainplayers
AT eduardopizoni cdwrecyclingplantsfinancialanalysisinfluencefactorsandtheroleofmainplayers
AT marcoaureliostumpfgonzalez cdwrecyclingplantsfinancialanalysisinfluencefactorsandtheroleofmainplayers
_version_ 1721200731644493824