Modelling of Nigerian Residential Electricity Consumption Using Multiple Regression Model with One Period Lagged Dependent Variable
This paper presents the modelling and forecasting of residential electricity consumption in Nigeria based on nine years (2006 and 2014) data and multiple regression model with one period lagged dependent variable. A Socio economic parameter (population), and climatic parameter (annual average tempe...
Main Authors: | Runcie Amlabu, Nseobong I. Okpura, Anthony Mfonobong Umoren |
---|---|
Format: | Article |
Language: | English |
Published: |
Varepsilon Ltd.
2017-04-01
|
Series: | Mathematical and Software Engineering |
Subjects: | |
Online Access: | http://varepsilon.com/index.php/mse/article/view/40 |
Similar Items
-
Least Square Regression Based Integrated Multi-Parameteric Demand Modeling for Short Term Load Forecasting
by: Irfan Ahmed Halepoto, et al.
Published: (2014-04-01) -
Least squares regression with errors in both variables: case studies
by: Elcio Cruz de Oliveira, et al.
Published: (2013-01-01) -
Least-squares fitting with errors in the response and
predictor
by: Burr T., et al.
Published: (2012-01-01) -
Consistency of the total least squares estimator in the linear errors-in-variables regression
by: Sergiy Shklyar
Published: (2018-05-01) -
Partial Robust M-Regression Estimator in the Presence of Multicollinearity and Vertical Outliers
by: Majid, M.N.A, et al.
Published: (2020)