Applied methodology for replacement pipe arcs in integral pipelines TE 'Oslomej'
The integral pipelines in thermal power plants present a linear spatial bearing construction with high operating parameters, complex static and dynamic load. The integral pipelines along its entire length are hanging on construction spring hangers from the boiler building, where the boiler is placed...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Savez inženjera i tehničara Srbije
2016-01-01
|
Series: | Tehnika |
Subjects: | |
Online Access: | http://scindeks-clanci.ceon.rs/data/pdf/0040-2176/2016/0040-21761602249T.pdf |