Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China

A deep foundation pit constructed for an underground transportation hub was excavated near the Yangtze River. Among the strata, there are two confined aquifers, between which lies an aquiclude that is partially missing. To guarantee the safety of pit excavation, the piezometric head of the upper con...

Full description

Bibliographic Details
Main Authors: Yang You, Changhong Yan, Baotian Xu, Shi Liu, Canhui Che
Format: Article
Language:English
Published: Elsevier 2018-06-01
Series:Journal of Rock Mechanics and Geotechnical Engineering
Online Access:http://www.sciencedirect.com/science/article/pii/S1674775517302184
id doaj-3fb9dae7a4604d659abb6fa935037c65
record_format Article
spelling doaj-3fb9dae7a4604d659abb6fa935037c652020-11-24T20:44:11ZengElsevierJournal of Rock Mechanics and Geotechnical Engineering1674-77552018-06-01103555566Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, ChinaYang You0Changhong Yan1Baotian Xu2Shi Liu3Canhui Che4School of Earth Science and Engineering, Nanjing University, Nanjing, 210046, ChinaSchool of Earth Science and Engineering, Nanjing University, Nanjing, 210046, China; Corresponding author.School of Earth Science and Engineering, Nanjing University, Nanjing, 210046, ChinaNanjing Branch, Anhui Hydrogeology and Engineering Geology Corporation, Nanjing, 210019, ChinaNanjing Branch, Anhui Hydrogeology and Engineering Geology Corporation, Nanjing, 210019, ChinaA deep foundation pit constructed for an underground transportation hub was excavated near the Yangtze River. Among the strata, there are two confined aquifers, between which lies an aquiclude that is partially missing. To guarantee the safety of pit excavation, the piezometric head of the upper confined aquifer, where the pit bottom is located, should be 1 m below the pit bottom, while that of the lower confined aquifer should be dewatered down to a safe water level to avoid uplift problem. The Yangtze River levee is notably close to the pit, and its deformation caused by dewatering should be controlled. A pumping test was performed to obtain the hydraulic conductivity of the upper confined aquifer. The average value of the hydraulic conductivity obtained from analytical calculation is 20.45 m/d, which is larger than the values from numerical simulation (horizontal hydraulic conductivity KH = 16 m/d and vertical hydraulic conductivity KV = 8 m/d). The difference between KH and KV indicates the anisotropy of the aquifer. Two dewatering schemes were designed for the construction and simulated by the numerical models for comparison purposes. The results show that though the first scheme could meet the dewatering requirements, the largest accumulated settlement and differential settlement would be 94.64 mm and 3.3‰, respectively, greatly exceeding the limited values. Meanwhile, the second scheme, in which the bottoms of the waterproof curtains in ramp B and the river side of ramp A are installed at a deeper elevation of −28 m above sea level, and 27 recharge wells are set along the levee, can control the deformation of the levee significantly. Keywords: Deep foundation pit, Parameter calculation, Dewatering schemes, Numerical simulationhttp://www.sciencedirect.com/science/article/pii/S1674775517302184
collection DOAJ
language English
format Article
sources DOAJ
author Yang You
Changhong Yan
Baotian Xu
Shi Liu
Canhui Che
spellingShingle Yang You
Changhong Yan
Baotian Xu
Shi Liu
Canhui Che
Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
Journal of Rock Mechanics and Geotechnical Engineering
author_facet Yang You
Changhong Yan
Baotian Xu
Shi Liu
Canhui Che
author_sort Yang You
title Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
title_short Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
title_full Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
title_fullStr Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
title_full_unstemmed Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
title_sort optimization of dewatering schemes for a deep foundation pit near the yangtze river, china
publisher Elsevier
series Journal of Rock Mechanics and Geotechnical Engineering
issn 1674-7755
publishDate 2018-06-01
description A deep foundation pit constructed for an underground transportation hub was excavated near the Yangtze River. Among the strata, there are two confined aquifers, between which lies an aquiclude that is partially missing. To guarantee the safety of pit excavation, the piezometric head of the upper confined aquifer, where the pit bottom is located, should be 1 m below the pit bottom, while that of the lower confined aquifer should be dewatered down to a safe water level to avoid uplift problem. The Yangtze River levee is notably close to the pit, and its deformation caused by dewatering should be controlled. A pumping test was performed to obtain the hydraulic conductivity of the upper confined aquifer. The average value of the hydraulic conductivity obtained from analytical calculation is 20.45 m/d, which is larger than the values from numerical simulation (horizontal hydraulic conductivity KH = 16 m/d and vertical hydraulic conductivity KV = 8 m/d). The difference between KH and KV indicates the anisotropy of the aquifer. Two dewatering schemes were designed for the construction and simulated by the numerical models for comparison purposes. The results show that though the first scheme could meet the dewatering requirements, the largest accumulated settlement and differential settlement would be 94.64 mm and 3.3‰, respectively, greatly exceeding the limited values. Meanwhile, the second scheme, in which the bottoms of the waterproof curtains in ramp B and the river side of ramp A are installed at a deeper elevation of −28 m above sea level, and 27 recharge wells are set along the levee, can control the deformation of the levee significantly. Keywords: Deep foundation pit, Parameter calculation, Dewatering schemes, Numerical simulation
url http://www.sciencedirect.com/science/article/pii/S1674775517302184
work_keys_str_mv AT yangyou optimizationofdewateringschemesforadeepfoundationpitneartheyangtzeriverchina
AT changhongyan optimizationofdewateringschemesforadeepfoundationpitneartheyangtzeriverchina
AT baotianxu optimizationofdewateringschemesforadeepfoundationpitneartheyangtzeriverchina
AT shiliu optimizationofdewateringschemesforadeepfoundationpitneartheyangtzeriverchina
AT canhuiche optimizationofdewateringschemesforadeepfoundationpitneartheyangtzeriverchina
_version_ 1716818106573127680