Multiple-criteria decision analysis for cross-country gas pipelines

The paper considers the shortand medium-term planning problems of the regimes of multi-line technical gas pipeline corridors (MLGP) of Russian gas supply system. The fall in gas production due to the depletion of the gas fields leads to a decrease in the load of some operating MLGPs. At the same tim...

Full description

Bibliographic Details
Main Authors: Sukharev Mikhail, Popov Ruslan, Balchenko Anton
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/28/e3sconf_mmmaosdphs18_03010.pdf
id doaj-3ecc19f4d94f45dab6efb480d5389687
record_format Article
spelling doaj-3ecc19f4d94f45dab6efb480d53896872021-03-02T08:57:38ZengEDP SciencesE3S Web of Conferences2267-12422019-01-011020301010.1051/e3sconf/201910203010e3sconf_mmmaosdphs18_03010Multiple-criteria decision analysis for cross-country gas pipelinesSukharev Mikhail0Popov Ruslan1Balchenko Anton2Gubkin Russian State University of Oil and Gas (National Research University)Gubkin Russian State University of Oil and Gas (National Research University)Gubkin Russian State University of Oil and Gas (National Research University)The paper considers the shortand medium-term planning problems of the regimes of multi-line technical gas pipeline corridors (MLGP) of Russian gas supply system. The fall in gas production due to the depletion of the gas fields leads to a decrease in the load of some operating MLGPs. At the same time, there is a redundancy of production capacities at compressor stations (CS). It becomes possible to use various technological schemes for incorporating CS with lines "pass by" in order to reduce the cost of gas pumping. The solution of the optimization task for the search for MLGP regimes in a one-criterion (minimum of the energy cost) formulation leads to frequent equipment switching. That is unacceptable. Therefore, it is advisable to proceed to multi-criteria statements, formalizing and introducing as criteria the requirements for the stability of technological schemes for switching on equipment, which are usually respected by the dispatch services. The purpose of this article is the development and testing of mathematical models and a computer program to support the adoption of dispatch solutions for managing modes of large MLGPs under conditions of incomplete loading. The solution method is demonstrated by the example of a three-line MLGP. The choice of optimal control is carried out using dynamic programming methods. In order to improve the quality of the choice of control actions, an algorithm is suggested that takes into account the stochastic nature of the loading of the MLGP.https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/28/e3sconf_mmmaosdphs18_03010.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Sukharev Mikhail
Popov Ruslan
Balchenko Anton
spellingShingle Sukharev Mikhail
Popov Ruslan
Balchenko Anton
Multiple-criteria decision analysis for cross-country gas pipelines
E3S Web of Conferences
author_facet Sukharev Mikhail
Popov Ruslan
Balchenko Anton
author_sort Sukharev Mikhail
title Multiple-criteria decision analysis for cross-country gas pipelines
title_short Multiple-criteria decision analysis for cross-country gas pipelines
title_full Multiple-criteria decision analysis for cross-country gas pipelines
title_fullStr Multiple-criteria decision analysis for cross-country gas pipelines
title_full_unstemmed Multiple-criteria decision analysis for cross-country gas pipelines
title_sort multiple-criteria decision analysis for cross-country gas pipelines
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2019-01-01
description The paper considers the shortand medium-term planning problems of the regimes of multi-line technical gas pipeline corridors (MLGP) of Russian gas supply system. The fall in gas production due to the depletion of the gas fields leads to a decrease in the load of some operating MLGPs. At the same time, there is a redundancy of production capacities at compressor stations (CS). It becomes possible to use various technological schemes for incorporating CS with lines "pass by" in order to reduce the cost of gas pumping. The solution of the optimization task for the search for MLGP regimes in a one-criterion (minimum of the energy cost) formulation leads to frequent equipment switching. That is unacceptable. Therefore, it is advisable to proceed to multi-criteria statements, formalizing and introducing as criteria the requirements for the stability of technological schemes for switching on equipment, which are usually respected by the dispatch services. The purpose of this article is the development and testing of mathematical models and a computer program to support the adoption of dispatch solutions for managing modes of large MLGPs under conditions of incomplete loading. The solution method is demonstrated by the example of a three-line MLGP. The choice of optimal control is carried out using dynamic programming methods. In order to improve the quality of the choice of control actions, an algorithm is suggested that takes into account the stochastic nature of the loading of the MLGP.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/28/e3sconf_mmmaosdphs18_03010.pdf
work_keys_str_mv AT sukharevmikhail multiplecriteriadecisionanalysisforcrosscountrygaspipelines
AT popovruslan multiplecriteriadecisionanalysisforcrosscountrygaspipelines
AT balchenkoanton multiplecriteriadecisionanalysisforcrosscountrygaspipelines
_version_ 1724240274321833984