An evaluation of the 360@ project management competency assessment questionnaire
The primary purpose of this study was to evaluate a 360@ project management competency questionnaire relevant to a chemical engineering environment. The competency questionnaire was developed using the input of the employees who took part in the appraisal. The secondary purpose of this study was to...
Main Authors: | D. Theron, G. Roodt |
---|---|
Format: | Article |
Language: | English |
Published: |
AOSIS
2001-12-01
|
Series: | SA Journal of Industrial Psychology |
Online Access: | https://sajip.co.za/index.php/sajip/article/view/786 |
Similar Items
-
Mental models as moderating variable in 360 degree competency assessments
by: D. Theron, et al.
Published: (2000-06-01) -
The Assessment of Managers' Competencies by 360-degree Feedback
by: Reza Gharaeepour, et al.
Published: (2005-07-01) -
Variability in multi-rater competency assessments
by: D. Theron, et al.
Published: (1999-06-01) -
Evaluation of 360 Image Projection Methods
by: Shih-Chieh Kuo, et al.
Published: (2017) -
Investigation of 360-degree Evaluation on Nursing Competency of PGYN
by: LU, CHIA-WEN, et al.
Published: (2018)