Multi-objective optimisation of hydroelectric PMSG considering water-level variation

The variable hydrological conditions that are found in run-of-the river projects require operations over a wide range of water-level variations. This article develops a novel optimisation strategy for permanent magnet synchronous generator (PMSG) used in hydroelectric plant. The basis of this strate...

Full description

Bibliographic Details
Main Authors: Jian Gao, Litao Dai, Wenjuan Zhang, Shoudao Huang
Format: Article
Language:English
Published: Wiley 2019-07-01
Series:The Journal of Engineering
Subjects:
Online Access:https://digital-library.theiet.org/content/journals/10.1049/joe.2019.0100

Similar Items