Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations
One of the problems of construction planning is failure to meet time constraints and increase of workflow duration. In the recent years informational technologies are efficiently used to solve the problem of estimation of construction period. The issue of optimal estimate of the duration of construc...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2016-10-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | http://vestnikmgsu.ru/index.php/archive/article/download/3431 |
id |
doaj-3d79e8fb3e404b08a6f06291fbfa1f54 |
---|---|
record_format |
Article |
spelling |
doaj-3d79e8fb3e404b08a6f06291fbfa1f542020-11-24T22:57:11ZengMoscow State University of Civil Engineering (MGSU)Vestnik MGSU 1997-09352016-10-011012013010.22227/1997-0935.2016.10.120-130Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectationsAlekseytsev Anatoliy Viktorovich0Kurchenko Natal’ya Sergeevna1Galkin Sergey Sergeevich2Bryansk State Technological University of Engineering (BSTU)Bryansk State Technological University of Engineering (BSTU)Bryansk State Technological University of Engineering (BSTU)One of the problems of construction planning is failure to meet time constraints and increase of workflow duration. In the recent years informational technologies are efficiently used to solve the problem of estimation of construction period. The issue of optimal estimate of the duration of construction, taking into account the possible organizational expectations is considered in the article. In order to solve this problem the iteration scheme of evolutionary modeling, in which random values of organizational expectations are used as variable parameters is developed. Adjustable genetic operators are used to improve the efficiency of the search for solutions. The reliability of the proposed approach is illustrated by an example of formation of construction schedules of monolithic foundations for buildings, taking into account possible disruptions of supply of concrete and reinforcement cages. Application of the presented methodology enables automated acquisition of several alternative scheduling of construction in accordance with standard or directive duration. Application of this computational procedure has the prospects of taking into account of construction downtime due to weather, accidents related to construction machinery breakdowns or local emergency collapses of the structures being erected.http://vestnikmgsu.ru/index.php/archive/article/download/3431time scheduleoptimizationdisruption of resources supplyorganizational expectationsevolutionary modelingduration of construction |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Alekseytsev Anatoliy Viktorovich Kurchenko Natal’ya Sergeevna Galkin Sergey Sergeevich |
spellingShingle |
Alekseytsev Anatoliy Viktorovich Kurchenko Natal’ya Sergeevna Galkin Sergey Sergeevich Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations Vestnik MGSU time schedule optimization disruption of resources supply organizational expectations evolutionary modeling duration of construction |
author_facet |
Alekseytsev Anatoliy Viktorovich Kurchenko Natal’ya Sergeevna Galkin Sergey Sergeevich |
author_sort |
Alekseytsev Anatoliy Viktorovich |
title |
Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations |
title_short |
Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations |
title_full |
Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations |
title_fullStr |
Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations |
title_full_unstemmed |
Method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations |
title_sort |
method for determining the duration of construction basing on evolutionary modeling taking into account random organizational expectations |
publisher |
Moscow State University of Civil Engineering (MGSU) |
series |
Vestnik MGSU |
issn |
1997-0935 |
publishDate |
2016-10-01 |
description |
One of the problems of construction planning is failure to meet time constraints and increase of workflow duration. In the recent years informational technologies are efficiently used to solve the problem of estimation of construction period. The issue of optimal estimate of the duration of construction, taking into account the possible organizational expectations is considered in the article. In order to solve this problem the iteration scheme of evolutionary modeling, in which random values of organizational expectations are used as variable parameters is developed. Adjustable genetic operators are used to improve the efficiency of the search for solutions. The reliability of the proposed approach is illustrated by an example of formation of construction schedules of monolithic foundations for buildings, taking into account possible disruptions of supply of concrete and reinforcement cages. Application of the presented methodology enables automated acquisition of several alternative scheduling of construction in accordance with standard or directive duration. Application of this computational procedure has the prospects of taking into account of construction downtime due to weather, accidents related to construction machinery breakdowns or local emergency collapses of the structures being erected. |
topic |
time schedule optimization disruption of resources supply organizational expectations evolutionary modeling duration of construction |
url |
http://vestnikmgsu.ru/index.php/archive/article/download/3431 |
work_keys_str_mv |
AT alekseytsevanatoliyviktorovich methodfordeterminingthedurationofconstructionbasingonevolutionarymodelingtakingintoaccountrandomorganizationalexpectations AT kurchenkonatalyasergeevna methodfordeterminingthedurationofconstructionbasingonevolutionarymodelingtakingintoaccountrandomorganizationalexpectations AT galkinsergeysergeevich methodfordeterminingthedurationofconstructionbasingonevolutionarymodelingtakingintoaccountrandomorganizationalexpectations |
_version_ |
1725651364707565568 |