Evaluation of the Simultaneous Operation of the Mechanisms for Cross-Border Interchange and Activation of the Regulating Reserves
This article examines the mechanisms for cross-border interchange of the regulating reserves (RRs), i.e., the imbalance-netting process (INP) and the cross-border activation of the RRs (CBRR). Both mechanisms are an additional service of frequency restoration reserves in the power system and connect...
Main Authors: | Marcel Topler, Boštjan Polajžer |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-09-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/11/17/8188 |
Similar Items
-
Improving the Cross-Border Activation of the Regulating Reserve to Enhance the Provision of Load-Frequency Control
by: Marcel Topler, et al.
Published: (2020-01-01) -
EXPERTS’ ASSESSMENTS OF CROSS-BORDER COOPERATION IN THE RUSSIAN FEDERATION MUNICIPALITIES
by: Ol’ga V. Tsvetkova
Published: (2018-11-01) -
Problems and Prospects in Development of the Cross-Border Cooperation in the Context of the European Integration of Ukraine
by: Kuzmin Oleh Ye, et al.
Published: (2017-02-01) -
Atlantic Lessons: Cross-border cooperation between Galicia and the Region of North Portugal
by: Celso Cancela OUTEDA
Published: (2019-06-01) -
Cross-Border Tourism and its Significance for Tourism Destinations
by: Roman LIVANDOVSCHI
Published: (2017-06-01)