Prediction of construction and assembly production in the province of Lower Silesia. Part I
The article is the first part of the series „Prediction construction and assembly production in Lower Silesia.” It was assumed that salary of employees will be one of the independent variables to determine the volume of production. Salaries of employees was predicted, using multiple regression and...
Main Author: | Magdalena Rogalska |
---|---|
Format: | Article |
Language: | English |
Published: |
Lublin University of Technology
2012-12-01
|
Series: | Budownictwo i Architektura |
Subjects: | |
Online Access: | https://ph.pollub.pl/index.php/bia/article/view/2224 |
Similar Items
-
Statistical methods for predicting tuberculosis incidence based on data from Guangxi, China
by: Yanling Zheng, et al.
Published: (2020-04-01) -
Previsão da temperatura média mensal de Uberlândia, MG, com modelos de séries temporais Forecast of monthly mean temperatures in Uberlândia, Minas Gerais, Brazil using time series models
by: Maria I. S. Silva, et al.
Published: (2008-10-01) -
Regression-SARIMA modelling of daily peak electricity demand in South Africa
by: Delson Chikobvu, et al.
Published: (2017-10-01) -
Epidemiology and Time Series Analysis of Human Brucellosis in Tebessa Province, Algeria, from 2000 to 2020
by: Akermi, S.E, et al.
Published: (2022) -
Forecasting the Electric Energy Supply in Duhok Province using Proposed Methods Based on Wavelet Analysis and Sarima Methods
by: Qais M. Abdulqader
Published: (2017-06-01)