Minimizing earthwork volumes by optimizing vertical alignment with linear programming algorithm
Earthwork cost is one of the major cost items (approximately 25% of the construction costs) in road construction projects. The amount of earthwork volumes therefore earthwork cost, mostly depends on the geometry of the road vertical alignment. We can conclude that an optimized vertical alignment has...
Main Authors: | Artun Aytug, Badenko Vladimir, Volkova Yulia, Radaev Anton |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/84/e3sconf_TPACEE2020_03028.pdf |
Similar Items
-
Optimizing the vertical alignment under earthwork block removal constraints in road construction
by: Rahman, Md. Faisal
Published: (2012) -
Optimizing the vertical alignment under earthwork block removal constraints in road construction
by: Rahman, Md. Faisal
Published: (2012) -
Optimizing the vertical alignment under earthwork block removal constraints in road construction
by: Rahman, Md. Faisal
Published: (2012) -
Earthworks planning for linear construction projects
by: Patterson, Daniel Edward
Published: (1997) -
The Optimal Model for Earthwork Construction
by: Zi-Cheng Gu, et al.
Published: (2002)