Pengalokasian Tenaga Kerja dengan Human Factor Engineering di PT. Pelindo I

Indonesia Port Corporation I (PT Pelabuhan Indonesia I (Persero)) or PT. Pelindo I is one of the Indonesian state-owned enterprises which manages port services in western Indonesia. Shipyard unit (Unit Galangan Kapal (UGK)) is a branch of PT. Pelindo I. At present, a problem arises if more than 2 sh...

Full description

Bibliographic Details
Main Authors: Yusnawati Yusnawati, Abdul Rahim Matondang, Listiani Nurul Huda
Format: Article
Language:English
Published: Universitas Andalas 2017-05-01
Series:Jurnal Optimasi Sistem Industri
Subjects:
Online Access:http://josi.ft.unand.ac.id/index.php/josi/article/view/106
id doaj-3bb6d3e60cc84cb8bd4189c136a0720a
record_format Article
spelling doaj-3bb6d3e60cc84cb8bd4189c136a0720a2020-11-24T23:38:04ZengUniversitas AndalasJurnal Optimasi Sistem Industri2088-48422442-87952017-05-01161343910.25077/josi.v16.n1.p34-39.2017123Pengalokasian Tenaga Kerja dengan Human Factor Engineering di PT. Pelindo IYusnawati Yusnawati0Abdul Rahim Matondang1Listiani Nurul Huda2Program Magister Teknik Industri, Fakultas Teknik, Universitas Sumatera Utara. Jl. Prof. T. Maas Kampus USU, MedanProgram Magister Teknik Industri, Fakultas Teknik, Universitas Sumatera Utara. Jl. Prof. T. Maas Kampus USU, MedanProgram Magister Teknik Industri, Fakultas Teknik, Universitas Sumatera Utara. Jl. Prof. T. Maas Kampus USU, MedanIndonesia Port Corporation I (PT Pelabuhan Indonesia I (Persero)) or PT. Pelindo I is one of the Indonesian state-owned enterprises which manages port services in western Indonesia. Shipyard unit (Unit Galangan Kapal (UGK)) is a branch of PT. Pelindo I. At present, a problem arises if more than 2 ships are being repaired at once in the unit, UGK scheduling overlaps the repairing activities. In order to solve the problem, study of human factor is important. Human factor is the study of the limitations, capabilities, and human behavior, as well as its interaction with the product, environment, equipment and the establishment of tasks and activities. One part of the human factor is the human factor in system design. In order to improve the effectiveness of the system, the human factor must be involved in each phase of the design process in the system design. This includes a number of activities to obtain input specification work, therefore the working methods and the optimal amount of labor can be determined. Human factors engineering is the application of science that utilizes research on the human factor and use the basic knowledge to design, to repair and to install the system. This research method is causal, searching for the causes which led to delays in the completion of ship repairing. Through human factor engineering approach to the allocation of labor increased by 12.23 per cent of the actual conditions, so that the delay of ship repair were not found during normal conditions.http://josi.ft.unand.ac.id/index.php/josi/article/view/106Faktor manusiaProses desainSpesifikasi kerjaAlokasi tenaga kerja
collection DOAJ
language English
format Article
sources DOAJ
author Yusnawati Yusnawati
Abdul Rahim Matondang
Listiani Nurul Huda
spellingShingle Yusnawati Yusnawati
Abdul Rahim Matondang
Listiani Nurul Huda
Pengalokasian Tenaga Kerja dengan Human Factor Engineering di PT. Pelindo I
Jurnal Optimasi Sistem Industri
Faktor manusia
Proses desain
Spesifikasi kerja
Alokasi tenaga kerja
author_facet Yusnawati Yusnawati
Abdul Rahim Matondang
Listiani Nurul Huda
author_sort Yusnawati Yusnawati
title Pengalokasian Tenaga Kerja dengan Human Factor Engineering di PT. Pelindo I
title_short Pengalokasian Tenaga Kerja dengan Human Factor Engineering di PT. Pelindo I
title_full Pengalokasian Tenaga Kerja dengan Human Factor Engineering di PT. Pelindo I
title_fullStr Pengalokasian Tenaga Kerja dengan Human Factor Engineering di PT. Pelindo I
title_full_unstemmed Pengalokasian Tenaga Kerja dengan Human Factor Engineering di PT. Pelindo I
title_sort pengalokasian tenaga kerja dengan human factor engineering di pt. pelindo i
publisher Universitas Andalas
series Jurnal Optimasi Sistem Industri
issn 2088-4842
2442-8795
publishDate 2017-05-01
description Indonesia Port Corporation I (PT Pelabuhan Indonesia I (Persero)) or PT. Pelindo I is one of the Indonesian state-owned enterprises which manages port services in western Indonesia. Shipyard unit (Unit Galangan Kapal (UGK)) is a branch of PT. Pelindo I. At present, a problem arises if more than 2 ships are being repaired at once in the unit, UGK scheduling overlaps the repairing activities. In order to solve the problem, study of human factor is important. Human factor is the study of the limitations, capabilities, and human behavior, as well as its interaction with the product, environment, equipment and the establishment of tasks and activities. One part of the human factor is the human factor in system design. In order to improve the effectiveness of the system, the human factor must be involved in each phase of the design process in the system design. This includes a number of activities to obtain input specification work, therefore the working methods and the optimal amount of labor can be determined. Human factors engineering is the application of science that utilizes research on the human factor and use the basic knowledge to design, to repair and to install the system. This research method is causal, searching for the causes which led to delays in the completion of ship repairing. Through human factor engineering approach to the allocation of labor increased by 12.23 per cent of the actual conditions, so that the delay of ship repair were not found during normal conditions.
topic Faktor manusia
Proses desain
Spesifikasi kerja
Alokasi tenaga kerja
url http://josi.ft.unand.ac.id/index.php/josi/article/view/106
work_keys_str_mv AT yusnawatiyusnawati pengalokasiantenagakerjadenganhumanfactorengineeringdiptpelindoi
AT abdulrahimmatondang pengalokasiantenagakerjadenganhumanfactorengineeringdiptpelindoi
AT listianinurulhuda pengalokasiantenagakerjadenganhumanfactorengineeringdiptpelindoi
_version_ 1725517827342860288