Strengthening, rehabilitation and widening of the existing arch bridge on national route 7 over the Olifants River, South Africa
This paper describes the rehabilitation of the existing bridge over the Olifants River. The bridge is on National Route 7 near Klawer and dates back to 1957. The defining feature of this elegant bridge is a concrete arch spanning 92.7 m. The existing bridge displayed extensive cracking, failed expan...
Main Authors: | van der Spuy Pierre, Niehaus Hennie |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201819910008 |
Similar Items
-
Olifants River Bridge Widening
by: Rowan Andrew, et al.
Published: (2018-01-01) -
Widening of The Nockeby Bridge : Methods for strengthening the torsional resistance
by: Andersson, Jenny
Published: (2016) -
Preliminary design and multi-criteria analysis of solutions for widening an existing concrete bridge : Case of the Bridge of Chaillot in Vierzon (France)
by: Fline, Pierre
Published: (2011) -
Load Distribution Factor before and after Widening of Existing T - beam Bridges
by: L.P.Huang, et al.
Published: (2017-06-01) -
Strengthening of a railway arch bridge from 1854
by: Andersen Ole Viggo
Published: (2018-01-01)