Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method

Metro tunnel sections in China can generally be divided into two types, those in granite formations (D = 6.0 m) and those in soft soils (D = 6.2 m), to which the same shield tunnel machine cannot be applied. The consequent low rate of machine utilization needs to be addressed. One solution is to mod...

Full description

Bibliographic Details
Main Authors: Qingfei Luo, Wei Li, Honglin Su, Xinru Chen
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2020/8861801
id doaj-3944d04b8f8740d280396962be41d581
record_format Article
spelling doaj-3944d04b8f8740d280396962be41d5812020-11-25T04:07:56ZengHindawi LimitedMathematical Problems in Engineering1563-51472020-01-01202010.1155/2020/88618018861801Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation MethodQingfei Luo0Wei Li1Honglin Su2Xinru Chen3School of Railway TransportationSchool of Civil EngineeringSinohydro Engineering Bureau 7 Co., Ltd.Shanghai Baoye Group Corp. Ltd.Metro tunnel sections in China can generally be divided into two types, those in granite formations (D = 6.0 m) and those in soft soils (D = 6.2 m), to which the same shield tunnel machine cannot be applied. The consequent low rate of machine utilization needs to be addressed. One solution is to modify shield machines which tend to tunnel granite strata with varying degrees of weathering (D = 6.0 m) into those applicable in soft soils (D = 6.2 m). Shield tunneling is a complex operation accompanied by potential risks, and accordingly it is demanded in risk evaluation and management. Hence, according to the construction features of modified shield machines in soft soil areas, this paper identifies relevant risks before establishing a specific model of risk evaluation by virtue of a fuzzy comprehensive evaluation method. This model weighs risk factors by triangular fuzzy numbers, and the membership function included is of L-R type that is frequently used in engineering. This risk evaluation model is applied to one section tunnel (Binhai New Town-Lianhua) of Metro Line 6 in Fuzhou City. Tunneling tests in the field uncover problems of the modified shield machine, including inappropriate tunneling parameters, segment dislocation, segment damage, and inadequate grouting. The result conforms to that produced by the risk evaluation model, which in turn proves the reliability of this model. Field data are also analyzed to address existing problems and to determine the appropriate tunneling parameters. The validity of these tunneling parameters is verified when surface settlement is measured.http://dx.doi.org/10.1155/2020/8861801
collection DOAJ
language English
format Article
sources DOAJ
author Qingfei Luo
Wei Li
Honglin Su
Xinru Chen
spellingShingle Qingfei Luo
Wei Li
Honglin Su
Xinru Chen
Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method
Mathematical Problems in Engineering
author_facet Qingfei Luo
Wei Li
Honglin Su
Xinru Chen
author_sort Qingfei Luo
title Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method
title_short Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method
title_full Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method
title_fullStr Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method
title_full_unstemmed Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method
title_sort evaluating construction risks of modified shield machine applicable to soft soils based on fuzzy comprehensive evaluation method
publisher Hindawi Limited
series Mathematical Problems in Engineering
issn 1563-5147
publishDate 2020-01-01
description Metro tunnel sections in China can generally be divided into two types, those in granite formations (D = 6.0 m) and those in soft soils (D = 6.2 m), to which the same shield tunnel machine cannot be applied. The consequent low rate of machine utilization needs to be addressed. One solution is to modify shield machines which tend to tunnel granite strata with varying degrees of weathering (D = 6.0 m) into those applicable in soft soils (D = 6.2 m). Shield tunneling is a complex operation accompanied by potential risks, and accordingly it is demanded in risk evaluation and management. Hence, according to the construction features of modified shield machines in soft soil areas, this paper identifies relevant risks before establishing a specific model of risk evaluation by virtue of a fuzzy comprehensive evaluation method. This model weighs risk factors by triangular fuzzy numbers, and the membership function included is of L-R type that is frequently used in engineering. This risk evaluation model is applied to one section tunnel (Binhai New Town-Lianhua) of Metro Line 6 in Fuzhou City. Tunneling tests in the field uncover problems of the modified shield machine, including inappropriate tunneling parameters, segment dislocation, segment damage, and inadequate grouting. The result conforms to that produced by the risk evaluation model, which in turn proves the reliability of this model. Field data are also analyzed to address existing problems and to determine the appropriate tunneling parameters. The validity of these tunneling parameters is verified when surface settlement is measured.
url http://dx.doi.org/10.1155/2020/8861801
work_keys_str_mv AT qingfeiluo evaluatingconstructionrisksofmodifiedshieldmachineapplicabletosoftsoilsbasedonfuzzycomprehensiveevaluationmethod
AT weili evaluatingconstructionrisksofmodifiedshieldmachineapplicabletosoftsoilsbasedonfuzzycomprehensiveevaluationmethod
AT honglinsu evaluatingconstructionrisksofmodifiedshieldmachineapplicabletosoftsoilsbasedonfuzzycomprehensiveevaluationmethod
AT xinruchen evaluatingconstructionrisksofmodifiedshieldmachineapplicabletosoftsoilsbasedonfuzzycomprehensiveevaluationmethod
_version_ 1715044878930411520