A METHODOLOGY FOR IMPROVING PRODUCTIVITY OF THE EXISTING SHIPBUILDING PROCESS USING MODERN PRODUCTION CONCEPTs AND THE AHP METHOD

In recent years, shipyards have been facing difficulties in controlling operational costs. To maintain continual operation of all of the facilities, a shipyard must analyze ways of utilizing present production systems for assembling interim vessel products as well as other types of industrial constr...

Full description

Bibliographic Details
Main Authors: Venesa Stanić, Tin Matulja, Nikša Fafandjel
Format: Article
Language:English
Published: Faculty of Mechanical Engineering and Naval Architecture 2017-01-01
Series:Brodogradnja
Online Access:http://hrcak.srce.hr/file/264426