A Framework for the Selection of Optimum Offshore Wind Farm Locations for Deployment

This research develops a framework to assist wind energy developers to select the optimum deployment site of a wind farm by considering the Round 3 available zones in the UK. The framework includes optimization techniques, decision-making methods and experts’ input in order to support inve...

Full description

Bibliographic Details
Main Authors: Varvara Mytilinou, Estivaliz Lozano-Minguez, Athanasios Kolios
Format: Article
Language:English
Published: MDPI AG 2018-07-01
Series:Energies
Subjects:
Online Access:http://www.mdpi.com/1996-1073/11/7/1855
id doaj-3912365ff6f0449a9a6abeb713a190ce
record_format Article
spelling doaj-3912365ff6f0449a9a6abeb713a190ce2020-11-24T23:36:18ZengMDPI AGEnergies1996-10732018-07-01117185510.3390/en11071855en11071855A Framework for the Selection of Optimum Offshore Wind Farm Locations for DeploymentVarvara Mytilinou0Estivaliz Lozano-Minguez1Athanasios Kolios2Renewable Energy Marine Structures Centre for Doctoral Training, Cranfield University, Cranfield, Bedfordshire MK43 0AL, UKDepartment of Mechanical Engineering and Materials—CIIM, Universitat Politècnica de València, Camino de Vera s/n, 46022 Valencia, SpainDepartment of Naval Architecture, Ocean & Marine Engineering, University of Strathclyde, HD2.35, Henry Dyer Building, 100 Montrose Street, Glasgow G4 0LZ, UKThis research develops a framework to assist wind energy developers to select the optimum deployment site of a wind farm by considering the Round 3 available zones in the UK. The framework includes optimization techniques, decision-making methods and experts’ input in order to support investment decisions. Further, techno-economic evaluation, life cycle costing (LCC) and physical aspects for each location are considered along with experts’ opinions to provide deeper insight into the decision-making process. A process on the criteria selection is also presented and seven conflicting criteria are being considered for implementation in the technique for the order of preference by similarity to the ideal solution (TOPSIS) method in order to suggest the optimum location that was produced by the nondominated sorting genetic algorithm (NSGAII). For the given inputs, Seagreen Alpha, near the Isle of May, was found to be the most probable solution, followed by Moray Firth Eastern Development Area 1, near Wick, which demonstrates by example the effectiveness of the newly introduced framework that is also transferable and generic. The outcomes are expected to help stakeholders and decision makers to make better informed and cost-effective decisions under uncertainty when investing in offshore wind energy in the UK.http://www.mdpi.com/1996-1073/11/7/1855multi-objective optimizationnondominated sorting genetic algorithm (NSGA)multi-criteria decision making (MCDM)technique for the order of preference by similarity to the ideal solution (TOPSIS)life cycle cost
collection DOAJ
language English
format Article
sources DOAJ
author Varvara Mytilinou
Estivaliz Lozano-Minguez
Athanasios Kolios
spellingShingle Varvara Mytilinou
Estivaliz Lozano-Minguez
Athanasios Kolios
A Framework for the Selection of Optimum Offshore Wind Farm Locations for Deployment
Energies
multi-objective optimization
nondominated sorting genetic algorithm (NSGA)
multi-criteria decision making (MCDM)
technique for the order of preference by similarity to the ideal solution (TOPSIS)
life cycle cost
author_facet Varvara Mytilinou
Estivaliz Lozano-Minguez
Athanasios Kolios
author_sort Varvara Mytilinou
title A Framework for the Selection of Optimum Offshore Wind Farm Locations for Deployment
title_short A Framework for the Selection of Optimum Offshore Wind Farm Locations for Deployment
title_full A Framework for the Selection of Optimum Offshore Wind Farm Locations for Deployment
title_fullStr A Framework for the Selection of Optimum Offshore Wind Farm Locations for Deployment
title_full_unstemmed A Framework for the Selection of Optimum Offshore Wind Farm Locations for Deployment
title_sort framework for the selection of optimum offshore wind farm locations for deployment
publisher MDPI AG
series Energies
issn 1996-1073
publishDate 2018-07-01
description This research develops a framework to assist wind energy developers to select the optimum deployment site of a wind farm by considering the Round 3 available zones in the UK. The framework includes optimization techniques, decision-making methods and experts’ input in order to support investment decisions. Further, techno-economic evaluation, life cycle costing (LCC) and physical aspects for each location are considered along with experts’ opinions to provide deeper insight into the decision-making process. A process on the criteria selection is also presented and seven conflicting criteria are being considered for implementation in the technique for the order of preference by similarity to the ideal solution (TOPSIS) method in order to suggest the optimum location that was produced by the nondominated sorting genetic algorithm (NSGAII). For the given inputs, Seagreen Alpha, near the Isle of May, was found to be the most probable solution, followed by Moray Firth Eastern Development Area 1, near Wick, which demonstrates by example the effectiveness of the newly introduced framework that is also transferable and generic. The outcomes are expected to help stakeholders and decision makers to make better informed and cost-effective decisions under uncertainty when investing in offshore wind energy in the UK.
topic multi-objective optimization
nondominated sorting genetic algorithm (NSGA)
multi-criteria decision making (MCDM)
technique for the order of preference by similarity to the ideal solution (TOPSIS)
life cycle cost
url http://www.mdpi.com/1996-1073/11/7/1855
work_keys_str_mv AT varvaramytilinou aframeworkfortheselectionofoptimumoffshorewindfarmlocationsfordeployment
AT estivalizlozanominguez aframeworkfortheselectionofoptimumoffshorewindfarmlocationsfordeployment
AT athanasioskolios aframeworkfortheselectionofoptimumoffshorewindfarmlocationsfordeployment
AT varvaramytilinou frameworkfortheselectionofoptimumoffshorewindfarmlocationsfordeployment
AT estivalizlozanominguez frameworkfortheselectionofoptimumoffshorewindfarmlocationsfordeployment
AT athanasioskolios frameworkfortheselectionofoptimumoffshorewindfarmlocationsfordeployment
_version_ 1725524147176472576