Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada Pringsewu

Project is a unique sequence of interrelated activities to achieve particular result and done in particular time period. Due to time and budget limitation, management undertaking of a project needs to be evaluated by using a special method in order to avoid loss and retardation. CPM and S Curve are...

Full description

Bibliographic Details
Main Authors: Weka Indra Dharmawan, Devi Oktarina, Tito Catur Wibowo
Format: Article
Language:English
Published: Universitas Diponegoro 2017-07-01
Series:Media Komunikasi Teknik Sipil
Subjects:
Online Access:http://ejournal.undip.ac.id/index.php/mkts/article/view/14729
id doaj-37aa2afb55b44308a1c74d9241ab84f1
record_format Article
spelling doaj-37aa2afb55b44308a1c74d9241ab84f12020-11-25T00:09:20ZengUniversitas DiponegoroMedia Komunikasi Teknik Sipil0854-18092549-67782017-07-01231596810.14710/mkts.v23i1.1472911831Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada PringsewuWeka Indra Dharmawan0Devi Oktarina1Tito Catur Wibowo2Prodi Teknik Sipil Fak. Teknik Universitas Malahayati Lampung Jl. Pramuka No. 27 Kemiling Bandar LampungDosen Prodi Teknik Sipil Fak. Teknik Universitas Malahayati Lampung Jl. Pramuka No. 27 Kemiling Bandar LampungProdi Teknik Sipil Fak. Teknik Universitas Malahayati Lampung Jl. Pramuka No. 27 Kemiling Bandar LampungProject is a unique sequence of interrelated activities to achieve particular result and done in particular time period. Due to time and budget limitation, management undertaking of a project needs to be evaluated by using a special method in order to avoid loss and retardation. CPM and S Curve are among evaluation methods. This study was to identify network, critical activities, critical event, critical line and to analyze optimum cost and duration of VVIP Building development project of Mitra Husada Hospital Pringsewu with time acceleration to avoid retardation. Result showed that after S Curve Evaluation done, implementation cost could be reduced 10% lower than realization cost from IDR 12,423,077,000.00 to be IDR 11,293,707,000.00. Mean while, after acceleration by using CPM method, the critical line decreased from three to one line and project duration shortened from 448 days to be 360 days. Evaluation of projects using the S Curve and with the CPM shows a simple way of evaluation and can be done by various actors of construction.http://ejournal.undip.ac.id/index.php/mkts/article/view/14729Critical activities, critical events, critical line, optimum duration, optimum cost,CPM Method – S Curve
collection DOAJ
language English
format Article
sources DOAJ
author Weka Indra Dharmawan
Devi Oktarina
Tito Catur Wibowo
spellingShingle Weka Indra Dharmawan
Devi Oktarina
Tito Catur Wibowo
Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada Pringsewu
Media Komunikasi Teknik Sipil
Critical activities, critical events, critical line, optimum duration, optimum cost,CPM Method – S Curve
author_facet Weka Indra Dharmawan
Devi Oktarina
Tito Catur Wibowo
author_sort Weka Indra Dharmawan
title Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada Pringsewu
title_short Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada Pringsewu
title_full Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada Pringsewu
title_fullStr Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada Pringsewu
title_full_unstemmed Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada Pringsewu
title_sort evaluasi penjadwalan proyek pengembangan rumah sakit mitra husada pringsewu
publisher Universitas Diponegoro
series Media Komunikasi Teknik Sipil
issn 0854-1809
2549-6778
publishDate 2017-07-01
description Project is a unique sequence of interrelated activities to achieve particular result and done in particular time period. Due to time and budget limitation, management undertaking of a project needs to be evaluated by using a special method in order to avoid loss and retardation. CPM and S Curve are among evaluation methods. This study was to identify network, critical activities, critical event, critical line and to analyze optimum cost and duration of VVIP Building development project of Mitra Husada Hospital Pringsewu with time acceleration to avoid retardation. Result showed that after S Curve Evaluation done, implementation cost could be reduced 10% lower than realization cost from IDR 12,423,077,000.00 to be IDR 11,293,707,000.00. Mean while, after acceleration by using CPM method, the critical line decreased from three to one line and project duration shortened from 448 days to be 360 days. Evaluation of projects using the S Curve and with the CPM shows a simple way of evaluation and can be done by various actors of construction.
topic Critical activities, critical events, critical line, optimum duration, optimum cost,CPM Method – S Curve
url http://ejournal.undip.ac.id/index.php/mkts/article/view/14729
work_keys_str_mv AT wekaindradharmawan evaluasipenjadwalanproyekpengembanganrumahsakitmitrahusadapringsewu
AT devioktarina evaluasipenjadwalanproyekpengembanganrumahsakitmitrahusadapringsewu
AT titocaturwibowo evaluasipenjadwalanproyekpengembanganrumahsakitmitrahusadapringsewu
_version_ 1725412525453869056